Inspection History Details
Inspection Status: Approved
Inspection History: ELECTRIC - FINAL
Permit Number - T06CM02412
Inspection Description - ELECTRIC - FINAL
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
05/28/2008 | ELECTRIC - FINAL | Approved | IVRS - Inspection :* | |
08/17/2007 | ELECTRIC - FINAL | Partial Approval | IVRS - Inspection :* LAST ITEM -- REVISED AS BUILT PLAN WITH APPROVAL STAMP 3RD PARTY OR CITY |
|
08/15/2007 | ELECTRIC - FINAL | Partial Approval | IVRS - Inspection :* 1. OUTSIDE - CAP OFF UNUSED BOX 2. CORDS NOT ALLOWED ABOVE CEILING 3. FINISH GUTTER & CONTROLLER - BACK DOOR 4. NEED VERIFICATION FOR SCREW IN FLEX CONNECTOR FOR OVER 250V 5. FINISH SPEAKER WIRES - 725.6 6. REVISE PLANS AS BUILT AND RESTAMP FOR FINAL OK ROOF, POWER TO GONDOLAS & LIGHTING, PANEL LABELING |
|
08/14/2007 | ELECTRIC - FINAL | Partial Approval | IVRS - Inspection :* OK PANEL PD1, P34, P2, "STARBUCKS P2", BD1, BD2 1. PROTECT SEAL TITE FROM SHARP METAL EDGES 2. FILL UNUSED OPENINGS IN GUTTER - BY DOOR 3. CONNECT GROUNDS - BY DOOR 4. CORDS NOT ALLOWED - BEER SIGNS 5. SHEETMETAL SCREWS NOT ALLOWED FOR GROUNDING COOKIE AISLE 6. FINISH SPEAKER WIRE |
|
08/13/2007 | ELECTRIC - FINAL | Partial Approval | IVRS - Inspection :* 1. NEED GENERATOR TEST REPORT 2. NEED LABELING FOR GENERATOR 700.8 3. VERIFY IF CONTROL WIRE IS 300V RATED (PIA) 4. FINISH LABELING AS PER 408.4 -- NO ABBREVIATIONS 5. CORRECTLY INSTALL LOCK NUTS 6. VERIFY MULTI-POLE TERMINATIONS AT BREAKERS |
|
08/09/2007 | ELECTRIC - FINAL | Denied | IVRS - Inspection : Work is not complete enough to inspect.| 950* OK CORD DROP SELF CHECK WRAPS 1. BOX FILL IN HALL 2. FINISH BAKERY/DELI FROM 7/11/07 3. SUPPORT NEW CABLING (VDV) AS PER 725.6 4. PANELS SCHEDULES TO BE AS PER 408.4 |
|
07/26/2007 | ELECTRIC - FINAL | Partial Approval | IVRS - Inspection :* OK COMPACTOR |
|
07/19/2007 | ELECTRIC - FINAL | Denied | IVRS - Inspection : The wiring is not complete or does not comply with code.| 245* COMPACTOR: 1. FINISH BOND BUSHINGS - 250.97 2. CONDUCTORS TO BE COLOR CODED 277/480V - 210.5(C) AMENDMENTS 3. BOND ENCLOSURE DELI BAKERY/HALL: 1. FINISH ITEMS 1, 2, 3 OF 7/11/07 CORD DROP CASH WRAPS: 1. FINISH ITEMS 1 & 2 OF 7/17/07 |
|
07/17/2007 | ELECTRIC - FINAL | Partial Approval | IVRS - Inspection :* OK CORD DROP OLIVE BAR OK SUSHI BAR 1. CORD DROP SELF CHECK WRAPS A. SUPPORT FLEX 300.11 B. GROUND JUNCTION BOX RECEIVED MONEY ORDER 08-748650391 -- $108.00 |
|
07/17/2007 | ELECTRIC - FINAL | Denied | IVRS - Inspection : The wiring is not complete or does not comply with code.| 245* COMPACTOR: 1. BOND BUSHING AT CONCENTRICS 250.97 2. TIGHTEN LUGS & LOCKNUTS & MISSING LOCKNUTS 3. CLEAN METAL SHAVINGS IN BOTTOM CONTROL BOX SUSHI KIOSK 1. GROUND JUNCTION BOX 2. FILL UNUSED OPENINGS 3. GFI'S NOT WORKING |
|
07/12/2007 | ELECTRIC - FINAL | Denied | IVRS - Inspection : Work is not complete enough to inspect.| 950* |
|
07/11/2007 | ELECTRIC - FINAL | Partial Approval | IVRS - Inspection :* 1. CONDUIT SUPPORTS TO BE EFFECTIVE 2. SEAL ENTRANCE TO WALK-IN AS PER 300.4 BAKERY/DELI 3. SUPPORT M/C 12" BOX - 6' LIGHT OK LIGHTS MAGAZINE/CARDS OK FLOOR BOXES OK LIGHTS BAKERY/DELI OK CORD DROPS 4 |
|
07/03/2007 | ELECTRIC - FINAL | Partial Approval | IVRS - Inspection :* OK DELI CASE OK BACK WALL BAKERY OK DEFROST FAN OK SODA STATION OK RECOVERY W/H OK SODA LIGHTS OK COSMETIC LIGHTS |
|
06/28/2007 | ELECTRIC - FINAL | Partial Approval | IVRS - Inspection :* OK 2 DAIRY COFFINS CASES REFRIGERATION PWR OK DELI ISLAND REFRIGERATION PWR 1. MOUNT BOXES AS PER 314.23 -- NO SCREWS INSIDE RECEIVED MONEY ORDER #08-741556313 FOR $108.00 |
|
06/27/2007 | ELECTRIC - FINAL | Partial Approval | IVRS - Inspection :* 1. SUPPORT CONDUITS EXITING CONDUCTORS 2. SEAL FLOOR BOXES FROM WATER EXCLUSIONS OK ROTISSIERE OK 2 PLUGS IN CEILING TILE OK FRONT TO TILE EXCEPT AS NOTED OK 2 PLUGS BAKERY LINE UP |
|
06/25/2007 | ELECTRIC - FINAL | Partial Approval | 1. FULLY TERMINATE CONDUCTORS AT TRAC'S 2. PROPERLY GROUND LIGHTS DELI - USE TERMINAL END WITH STRANDED CONDUCTORS 3. BOND JUMPER TO BE PER 250.122 4. CORDS NOT ALLOWED ABOVE CEILING 400.7 & 400.8 OK DOORS & FLY FANS (2) OK TO CLOSE CEILING AT GONDOLA OK CHEESE TABLE OK BAKERY OVEN OK PROOFER RECEIVED MONEY ORDER 08-741556197 FOR $108.00 |
|
06/20/2007 | ELECTRIC - FINAL | Partial Approval | IVRS - Inspection :* OK DISCONNECT MAIN AIR HANDLER OK BAKERY COOLER |
|
06/19/2007 | ELECTRIC - FINAL | Denied | IVRS - Inspection : Work is not complete enough to inspect.| 950* 1. EQUIPMENT BONDING JUMPER TO BE AS PER 250.122 2. MAINTAIN WORKING CLEARANCE OVEN DISCONNECT 110.26 3. IDENTIFY CONDUCTORS CORRECTLY 200.6 |
|
06/15/2007 | ELECTRIC - FINAL | Partial Approval | IVRS - Inspection :* 1) GROUND LIGHT FIXTURES 2) DEMO OUT CONDUIT LAYING ON GRID 3) SEAL OPEN CONDUITS 4) SUPPORT SECURITY CAM WIRE IN SOFFIT |
|
06/14/2007 | ELECTRIC - FINAL | Partial Approval | OK TO ENERGIZE EVAP CONDENSOR RECEIVED CHECK #1008 FOR $108.00 |
|
06/12/2007 | ELECTRIC - FINAL | Partial Approval | IVRS - Inspection :* OK EVAP CONDENSOR CONTROLS TO CROSSOVER 1. VERIFY IS SCREW IN FLEX CONNECTOR GOOD FOR OVER 250V |
|
06/11/2007 | ELECTRIC - FINAL | Partial Approval | IVRS - Inspection :* OK SEAFOOD PREP AREA TO USE OK ROOF OVER NEW AREA 1. SUPPORT MC & FLEX CONDUITS AS PER 300.11 2. TIGHTEN LOOSE FITTINGS |
|
06/08/2007 | ELECTRIC - FINAL | Partial Approval | IVRS - Inspection :* | |
06/07/2007 | ELECTRIC - FINAL | Partial Approval | IVRS - Inspection :* OK BAKERY AREA AIR HANDLER UNIT OK 3 FRONT END CASES OK 3 BACK END CASES |
|
06/06/2007 | ELECTRIC - FINAL | Partial Approval | IVRS - Inspection :* 1. ISOLATE PRIMARY CONDUCTOR TO BREAKER INSIDE OF UNIT. 2. SERVICE RECETACLE TO BE LIVE WHEN UNIT IS OFF 3. DOES 440.14 APPLY OK AIR HANDLER BREAKROOM |
|
06/05/2007 | ELECTRIC - FINAL | Partial Approval | IVRS - Inspection :* OK BEER CELLAR EAST TO NEW SECTION OK 1ST DRAFT STOP BACK TO BACK OF STORE OK M/C CABLES TO JUNCTION BOXES OK 3 RECEPTACLES COIN-STAR 1. SUPPORT FLEX 300.11 2. TIGHTEN LOOSE FITTINGS 3. CLEAN UP ABOVE CASES AND SECURE CABINET OR REMOVE |
|
05/31/2007 | ELECTRIC - FINAL | Partial Approval | IVRS - Inspection :* 1. GFI WIRED INCORRECTLY 2. DELI OCCUPIED WITHOUT INSPECTIONS COMPLETED 3. NEED CLEARANCE PANEL "BDI" OK CASH REGISTERS 5-B |
|
05/30/2007 | ELECTRIC - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1. IDENTIFICATION OF IG GROUNDS NOT DONE AS DISCUSSED 2. DELI PREP RECEPTACLES TO BE GFCI 3. PHARMACY SUPPORT OF VDV NOT DONE |
|
05/25/2007 | ELECTRIC - FINAL | Partial Approval | IVRS - Inspection :* OK STARBUCKS OK DELI CASES OK 3 + 3 CASH WRAPS SUBJECT TO REMOVAL OF ABANDONED VDV CABLING 725.3 & 800.3 |
|
05/24/2007 | ELECTRIC - FINAL | Partial Approval | 1. OPEN NEUTRAL STARBUCKS 2. CORDS NOT ALLOWED ABOVE CEILING 400.7 & 8 PHARMACY 3. FINISH VDV CABELING -- PHARMACY OK TEMP USAGE OF PHARMACY RECEIVED MO#08-741535490 $108.00 |
|
05/23/2007 | ELECTRIC - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1. FINISH ALL POWER TO DELI CASE 2. FINISH STARBUCKS KIOSK -- LIGHTS NOT WORKING CLEARLY LABEL ALL POWER FROM OTHER PANELS. |
|
05/22/2007 | ELECTRIC - FINAL | Not ready for Inspection | IVRS - Inspection :* WORK TO BE INSPECTED NOT READY |
|
05/21/2007 | ELECTRIC - FINAL | Partial Approval | IVRS - Inspection :* OK BAKERY CASES C-7 OK BATHROOMS 1. USE CORRECT HARDWARE TO HANG ELECTRICAL EQUIPMENT -- NOT DRYWALL SCREWS. 2. FILL UNUSED OPENINGS IN GUTTER PHARMACY 1. SUPPORT VDV CABLING 725.6, 800.6, 300.11 2. GROUNDING EQUIPMENT CONDUCTORS (ISO) TO BE CORRECTLY COLORED 250.119 ENTIRE LENGTH. 3. PLEASE VERIFY LISTING FOR ORANGE INTERDUCT. 4. PHARMACY IS IN USAGE WITHOUT APPROVAL INSPECTIONS PLEASE VACATE TO FINISH INSPECTIONS. |
|
05/15/2007 | ELECTRIC - FINAL | Partial Approval | IVRS - Inspection :* 1. OK PVC DELI SUBJECT TO VERIFICATION OF GLUE WITH CONDUIT. 2. OK SELF CHECK STANDS 3. OK WATER HEATER ABOVE STARBUCKS |
|
05/11/2007 | ELECTRIC - FINAL | Partial Approval | IVRS - Inspection :* 1) OK CONDUIT RUNS 3/4" AND 1" EMP THROUGH BACK SECTION 2) FINISH SELF CHECK STANDS |
|
05/10/2007 | ELECTRIC - FINAL | Partial Approval | IVRS - Inspection :* OK BACK 3 ROWS OF LIGHTS TO ENERGIZE OK TOWER DISCONNECTS OK WET RACK LAST 48' OK END CASES & CAP FROZEN 3 SUPPORT VDV CABELING AS PER 300.11 VDV CABLES TO BE SECURE UPON EXITING WALKER DUCT TIGHTEN CONNECTONS TO WALKER DUCT 1. PROTECT FLEX CONDUIT & VDV CABLES FROM PHYSICAL DAMAGE AT SELF CHECKOUT STANDS. |
|
05/07/2007 | ELECTRIC - FINAL | Partial Approval | IVRS - Inspection :* OK DELI WALL OK DELI COOLER UNIT -- NO LIGHTS OK WALKER DUCT FRONT OF STORE OK FRONT CANS OK FRONT ENTRANCE WALL |
|
05/03/2007 | ELECTRIC - FINAL | Partial Approval | IVRS - Inspection :* OK FROZEN FISH & MEAT CASES OK CONNECTIONS RACK "D" MAIN ROOF: 1. BOND BUSHINGS OVER 250V 250.97 2. LABEL DISCONNECTS 3. WE HAVE MULTIPLE TERMINATIONS AT LUGS 4. TIGHTEN LOOSE FITTINGS |
|
05/01/2007 | ELECTRIC - FINAL | Partial Approval | IVRS - Inspection :* 1. ARE BATHROOM RECEPTACLES GFCI PROTECTED 210.8? 2. EXTENDER RINGS MAY BE NEEDED IF MORE THAN 3/4" FROM BOX TO SURFACE. OK FROM BREAKER TO MAIN LUGS RACK "D" |
|
04/26/2007 | ELECTRIC - FINAL | Partial Approval | IVRS - Inspection :* 1. OK FINAL 20' OF 4" PVC & 2 2" PVC FROM FRYS BUILDING TO FUTURE GAS STATION 2. OK FINAL ROW OF LIGHTS IN STOCK ROOM |
|
04/23/2007 | ELECTRIC - FINAL | Partial Approval | IVRS - Inspection :* 1. WRAP AND PROTECT WALKER DUCT ADAPTOR PER 300.7 2. NEED TEMP CIRCUIT DIRECTORY FOR STARBUCKS PANEL 3. SUPPORT M/C CABLE FROM "J" BOXES OK WATER DUCT CONNECTIONS OK FROZEN FISH & MEAT CASES OK FROZEN FOOD END CAPS (4) OK TO COVER CONDUITS PRODUCE WALL 4. SUPPORT JP CABLES & CABLING OR CASH COUNTERS 5. TIGHTEN LOOSE FITTINGS RECEIVED MONEY ORDER FOR $108.00 |
|
04/19/2007 | ELECTRIC - FINAL | Partial Approval | IVRS - Inspection :* | |
04/17/2007 | ELECTRIC - FINAL | Partial Approval | IVRS - Inspection :* PHARMACY 1. 2X4'S TO BE SECURELY ATTACHED TO GRID 410.16 2. TIGHTEN LOOSE M/C CONNECTORS 3. LABEL DISCONNECT 4. FINISH VDV CABELING PANEL STARBUCKS 1. TIGHTEN TRAPEZE NUTS 2. TIGHTEN LOOSE SET SCREW FITTINGS OK WALL FOR STARBUCKS PANEL FEEDER |
|
04/13/2007 | ELECTRIC - FINAL | Partial Approval | IVRS - Inspection :* | |
04/12/2007 | ELECTRIC - FINAL | Partial Approval | IVRS - Inspection :* 1. SUPPORT VDV CABLING AS PER 725.3 & 6, 800.3 & 6 MEAT SHOP 2. GROUND JUNCTION BOXES WITH DEVICES 3. LABEL CIRCUITS IN DEFROST PANEL 408.4 ALSO, LABEL BREAKERS -- TO BE DONE BY 4/13/07 OK TO ENERGIZE MEAT COOLER, MEAT PREP, PACKAGE DELI OK TO CLOSE BOXES ABOVE MEAT SHOP |
|
04/11/2007 | ELECTRIC - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1. FITTINGS STILL LOOSE 2. USE APPROVED STRAPS - NOT PLUMBERS TAPE 3. SUPPORT VDV CABELING 725.6 OK 3/4" PVC EAST WALL OUT PROMO DISPLAY DAIRY OK EAST EXTERIOR WALL |
|
04/10/2007 | ELECTRIC - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1. LOOSE FITTINGS - FLEX & CONDUIT 2. SUPPORT CONDUITS & FLEX CONDUITS 3. SUPPORT LOW VOLTAGE CONTROL WIRES DOWN WALL 4. MAKE UP INCOMPLETE 5. FILL UNUSED OPENINGS IN BOX -- NOT FITTINGS 6. GROUND JUNCTION BOX 7. CANNOT DISTINGUISH CIRCUITS AT PANEL FOR THIS EQUIPMENT. RECEIVED MONEY ORDER #08-684789450 $108.00 |
|
04/05/2007 | ELECTRIC - FINAL | Partial Approval | IVRS - Inspection :* 1. NEW VDV CABELING TO BE AS PER 300.11 2. TIGHTEN LOOSE FITTINGS 3. CANNOT STACK LUGS - W/H DISCONNECT 4. VERIFY DISCONNECTING MEANS FOR FLY FANS OK TEMP LIGHTING IN NEW AREA OK CONDUIT ON RACK FRONT HALF NEW AREA OK BOXES TO CLOSE BACKROOM * WILL NEED PLAN REVISIONS FOR W/H CHANGE |
|
04/03/2007 | ELECTRIC - FINAL | Partial Approval | IVRS - Inspection :* OK PVC CONDUITS OUT TO ISLAND SEAFOOD OK FLORAL CASES TO USE 1. SUPPORT & PROTECT PVC AT WALL 2. VERIFY BOX FILL FOR DAIRY COOLER LIGHTS (DOOR) |
|
03/26/2007 | ELECTRIC - FINAL | Partial Approval | IVRS - Inspection :* | |
03/25/2007 | ELECTRIC - FINAL | Not ready for Inspection | IVRS - Inspection :* | |
03/23/2007 | ELECTRIC - FINAL | Not ready for Inspection | IVRS - Inspection :* CANCELLED BY RANDY |
|
03/22/2007 | ELECTRIC - FINAL | Partial Approval | IVRS - Inspection :* OK 2 NEW MEAT COVERS 1. FILL ALL UNUSED OPENINGS IN BOXES |
|
03/20/2007 | ELECTRIC - FINAL | Partial Approval | IVRS - Inspection :* OK TEMP DAIRY COOLER OK TEMP END CAP COOLER OK WALL NEW BATHROOMS |
|
03/19/2007 | ELECTRIC - FINAL | Partial Approval | IVRS - Inspection :* 1. BOXES NOT ALLOWED SCREWS IN FRONT PORTION OF BOX 314.23 2. SHEETMETAL SCREWS NOT ALLOWED FOR GROUNDING OK DAIRY COOLER CEILING LIGHTING OK PHARMACY RADIUS - WALL |
|
03/16/2007 | ELECTRIC - FINAL | Partial Approval | IVRS - Inspection :* | |
03/15/2007 | ELECTRIC - FINAL | Partial Approval | IVRS - Inspection :* | |
03/14/2007 | ELECTRIC - FINAL | Partial Approval | IVRS - Inspection :* 1. GROUND LUG TO HAVE FULL SURFACE CONTACT 2. RACEWAYS TO BE CONTINUOUS 3. ISOLATE ENERGIZED CONDUCTORS INSIDE REFRIGERATION UNITS. 4. SEAL FOR INSIDE OF CONDUIT TO BE NON-COMBUSTIBLE. OK TO ENERGIZE EVAC OK WALLS SEAFOOD & MEAT ROOM |
|
03/12/2007 | ELECTRIC - FINAL | Partial Approval | IVRS - Inspection :* OK BAILER OK PRODUCE PREP COOLERS |
|
03/07/2007 | ELECTRIC - FINAL | Partial Approval | IVRS - Inspection :* 1. PREVENT TEMPERATURE DIFFERENCE 300.7 - PRODUCE PREP 2. BAILER: SUPPORT SEAL TITE, BOND PER 250.97, GROUNDING 250.8, CLEARANCE 110.26 OK 2 - 3/4" PVC FOR PRODUCE ISLAND OK TO ENERGIZE RECEPTACLES STOCK AREA, RACK B & C |
|
03/06/2007 | ELECTRIC - FINAL | Partial Approval | IVRS - Inspection :* OK CONDUITS & BOXES ON RACKS & PLUGS IN BACK STOCK ROOMS. |
|
03/01/2007 | ELECTRIC - FINAL | Partial Approval | IVRS - Inspection :* CHILLER: 1. TIGHTEN LOOSE FITTINGS 2. TAP CONTROL SIDE OF DISCONNECT CORRECTLY NOT MULTI-TAPING OF LUGS OK GROCERY FREEZER -- LIGHTING ONLY |
|
02/28/2007 | ELECTRIC - FINAL | Partial Approval | IVRS - Inspection :* 1. CHECK CONDUIT SUPPORT WHEN COLUMN IS BUILT 2. FILL UNUSED OPENINGS IN RACK "A" OK FROZEN 3 & RACK "A" TO ENERGIZE |
|
02/27/2007 | ELECTRIC - FINAL | Partial Approval | IVRS - Inspection :* OK WATER HEATER ABOVE PRODUCE COOLER |
|
02/26/2007 | ELECTRIC - FINAL | Partial Approval | IVRS - Inspection :* 1. PANEL SCHEDULES TO BE EVIDENT TO WHAT SERVED 408.4 2. LABEL WATER HEATER DISCONNECT 3. ONLY ONE CONDUCTOR PER LUG 4. CLEAN SURFACE UNDER LUG 5. MAINTAIN CLEARANCES AT REFRIGERATION CONTROLS OK BEER LINE UP, FROZEN 1 & 2 TO ENERGIZE |
|
02/23/2007 | ELECTRIC - FINAL | Partial Approval | IVRS - Inspection :* CIRCUIT BREAKERS CHANGED TO 15A AT FOLLOWING PNL PER ENG. LETTER ON DERATION PBD-2 2, 39, 41 RPA 2, 41 RLA 20, 25, 37, 39 PFA 18, 29, 31 RFA-2 3, 32, 34, 36 OK TO ENERGIZE |
|
02/22/2007 | ELECTRIC - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* |
|
02/16/2007 | ELECTRIC - FINAL | Partial Approval | IVRS - Inspection :* 1. SHEETMETAL SCREWS NOT ALLOWED FOR BONDING 250.8 2. FILL UNUSED OPENINGS RACK "B & G" 3. GROUND ENCLOSURE - CABINET CONTROLS 4. ONLY ONE CONDUCTOR PER TERMINAL |
|
02/15/2007 | ELECTRIC - FINAL | Partial Approval | IVRS - Inspection :* OK CASE WIRING FROZEN #2 |
|
02/14/2007 | ELECTRIC - FINAL | Partial Approval | IVRS - Inspection :* OK CASE WIRING - FROZEN I |
|
02/13/2007 | ELECTRIC - FINAL | Partial Approval | IVRS - Inspection :* OK CONDUITS TO FROZEN 1 FROM GUTTER OK CONDUIT 10' UP FROM PANELS BD2, BD1 |
|
02/12/2007 | ELECTRIC - FINAL | Partial Approval | IVRS - Inspection :* OK CONDUIT TO BEER LINE UP FROM GUTTER 1. PLEASE VERIFY LISTING LABELS FOR COOLERS. |
|
02/11/2007 | ELECTRIC - FINAL | Partial Approval | IVRS - Inspection :* | |
01/31/2007 | ELECTRIC - FINAL | Partial Approval | IVRS - Inspection :* 1) CONTRACTOR TO MAINTAIN LOCK OUT/ TAG OUT 2) PANELS AND SERVICES ARE CLEARED AS PER STICKER COMMENTS |
|
01/30/2007 | ELECTRIC - FINAL | Cancelled | CANCELLED BY DALE | |
01/18/2007 | ELECTRIC - FINAL | Partial Approval | IVRS - Inspection :* OK TEMP USAGE FOR PRODUCE PREP & COOLER |