Inspection History Details
Inspection Status: Approved
Inspection History: ENGINEERING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/24/2009 | ENGINEERING - FINAL | Approved | ||
| 11/28/2008 | ENGINEERING - FINAL | Partial Approval | OK FOR TEMP C OF O ONLY, PERMANENT C OF O FOR ENGINEERING NOT TO BE GIVEN UNTIL ALL PUNCHLIST ITEMS ARE COMPLETED AND THE FINAL GRADING INSPECTION FOR PERMIT #T07BU01353 IS COMPLETED AND APPROVED | |
| 11/21/2008 | ENGINEERING - FINAL | Denied | 1) Complete all items on the approved site plans. 2) Complete sidewalk to ROW at front of bldg. 3) Remove all construction debris and temp. trailers 4) Backfill all open trenches. 5) Complete parking area at front of existing bldg. 6) Call for re-inspection. |
|
| 10/20/2008 | ENGINEERING - FINAL | Cancelled | contractor called for rebar inspection for dumpster pad. See comments under grading permit #T07BU01353. Intermediate grading |