Inspection History Details
Inspection Status: Approved
Inspection History: ENGINEERING - FINAL
Permit Number - T06CM02334
Inspection Description - ENGINEERING - FINAL
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
09/05/2007 | ENGINEERING - FINAL | Approved | ||
08/13/2007 | ENGINEERING - FINAL | Not ready for Inspection | 1) SITE STILL UNDER CONSTRUCTION 2) MUST BE ABLE TO PROVIDE SAFE, UNOBSTRUCTED ACCESS FOR OCCUPANTS. 3) COMPLETE CONCRETE WORK, ROCK RIPRAP, OVERHEAD WORK REMOVE AND/OR SEPARATE ANY CONSTRUCTION MATERIALS, DEBRIS AND EQUIPMENT FROM THE PUBLIC. |
|
08/13/2007 | ENGINEERING - FINAL | Partial Approval | PARTIAL APPROVAL FOR TEMPORARY C OF O FOR ENGINEERING. 1) COMPLETE PAINTING OFF ROOF DOWN SPOUTS. 2) COMPLETE PAINTING OF BUILDING. 3) COMPLETE CONSTRUCTION OF HAIND RAILING AND BARRICADE AT NORTH END OF SITE NEAR DRAINAGE AND AT SOUTH END NEAR THE BASKETBALL COURTS. ALL REMAINING CONSTRUCTION MUST BE PHYSICALLY SEPARATED FROM PUBLIC AND STUDENTS AND/OR PERFORMED WHEN THEY ARE NOT ON SITE. |
|
08/09/2007 | ENGINEERING - FINAL | Not ready for Inspection | ||
08/03/2007 | ENGINEERING - FINAL | Not ready for Inspection | REMEMBER TO CALL IN FINAL GRADING FOR T06BU00980 SITE NOT READY-SUPER TO CHECK WITH MIKE 240-9859 |