Inspection History Details
Inspection Status: Approved
Inspection History: ENGINEERING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/04/2007 | ENGINEERING - FINAL | Approved | Contractor address punch list. Will hold remaining work on permit T05CM06116, 369 W. Valencia Rd. | |
| 11/27/2007 | ENGINEERING - FINAL | Not ready for Inspection | Received letter from engineer in regards to chapter XIV, section 14.2 (7). | |
| 11/26/2007 | ENGINEERING - FINAL | Not ready for Inspection | Contractor needs to: 1- Paint gates on trash enclosure. 2- Remove prt-a-potty, and trash dumpster. 3- Remove all SWPPP controls. 4- Repair asphalt in alley. (west and south) |
|
| 11/02/2007 | ENGINEERING - FINAL | Not ready for Inspection | Contractor needs to: 1- Install gates on trash enclosure. 2- Repair asphalt in alley. 3- Seperate construction activity from public access. 4- Provide letter from engineer in regards to drainage and basin. 5- Remove dumpster. 6- Remove port-a-potty. 7- Keep wash out cleaned up. 8- Remove SWPPP controls from catch basins. Spoke to Site super Pat in regards to. |