Inspection History Details
Inspection Status: Approved
Inspection History: ROOF NAILING
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/26/2006 | ROOF NAILING | Approved | IVRS - Inspection :* | |
| 08/16/2006 | ROOF NAILING | Partial Approval | IVRS - Inspection :* | |
| 08/11/2006 | ROOF NAILING | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) WORK NOT COMPLETED 2) HOLDOWNS MISSING THROUGHOUT HD1 SWB 3) PER DETAIL 11/S.2 8D COMMONS 6" ON CENTER EDGE 12" FIELD SWA WALLS 4) PROVIDE CONTINOUS TIE DOWN GLUE LAMB FIRST FLOOR 5) DBL STUD UNDER DBL GIRDER BOTH ENDS 2ND FLOOR 6) BLOCKING NOT COMPLETE UPSTAIRS 7) PROVIDE TRUSS CALC'S 8) GAS LINE PER HB 2256 PROVIDE TRACER WIRE 9) STOPPED INSPECTION |