Inspection History Details
Inspection Status: Approved
Inspection History: ELECTRIC - ABOVE CEILING
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/14/2007 | ELECTRIC - ABOVE CEILING | Approved | IVRS - Inspection :* | |
| 02/05/2007 | ELECTRIC - ABOVE CEILING | Partial Approval | IVRS - Inspection :* | |
| 01/31/2007 | ELECTRIC - ABOVE CEILING | Partial Approval | IVRS - Inspection :* | |
| 01/26/2007 | ELECTRIC - ABOVE CEILING | Denied | IVRS - Inspection : The wiring is not complete or does not comply with code.| 245* INSPECTION FOR SERVICE - LETTER OF TORQUE AND PERFORMANCE TEST - RECEIVED TODAY. DO NOT ENERGIZE ANY LOAD SIDE EQUIPMENT BEFORE APPROVAL FROM ELECTRICAL INSPECTOR. SAFE OFF/LOCK OUT EQUIPMENT & WIRING AS NEEDED TO INSURE SAFETY. OK TEP - TEC INSPECTION FOR CEILING: PARTIAL INSPECTION ONLY 1. GROUND ALL METAL ENCLOSURES - NEC 250.148A 2. HAVE OVERFILLED BOXES - NEC 314.16 3. PROPERLY SUPPORT/SECURE EMT - 358.30 REMOVE CEILING TILES ABOUT ALL ELECTRICAL EQUIPMENT FOR INSPECTION. |