Permit: T06CM02132

Parcel: 104090680

Inspection Status: Approved

Inspection History: EXCAVATION/LAYOUT REBAR & ZON

Permit Number - T06CM02132

Inspection Description - EXCAVATION/LAYOUT REBAR & ZON

Inspection Status - Approved

Date Description Inspector Results Comments
08/21/2006 EXCAVATION/LAYOUT REBAR & ZON Approved IVRS - Inspection :*
08/10/2006 EXCAVATION/LAYOUT REBAR & ZON Denied IVRS - Inspection :
See detailed listing on site.| 999*
07/25/2006 EXCAVATION/LAYOUT REBAR & ZON Partial Approval IVRS - Inspection :*
1) REAR ADDITION FOOTING OK TO DRY PACK UNDER SLAB
05/23/2006 EXCAVATION/LAYOUT REBAR & ZON Denied IVRS - Inspection :
See detailed listing on site.| 999*
1) LIVING ROOM BEAM TWISTED AND NEEDS ADDITIONAL SUPPORT UNDERNEATH
2) NEED VERIFICATION OF SOILS CONDITION (SUBSTANDARD) ?
3) MUST MAINTAIN MINIMUM 12" X 12" FOOTING UNDER EXISTING SLAB THROUGHOUT
4) BATHROOM PLATE BOLTS TO MINIMUM 1/2" DIAMETER 48" APART WITHIN 12" ENDS BOTTOM PLATE
5) NEED VERIFICATION OF FOUNDATION REAR ADDITION
6) INSTALL SHIMS BEARING HEADERS AT BEARING AT BEARING POINT GAPS
7) NEED CERTIFIED ENGINEER ANALYSIS OF EXISTING HOUSE FOUNDATION AND MASONRY WALLS AS WELL AS REPAIRS & SPECIAL INSPECTIONS
8) PLYWOOD OVERSPANNED EAST OVER HANG
9) INSTALL H2.5'S & JOIST HANGERS THROUGHOUT
10) INSTALL ADDITION/WIND BRACING SOUTH WALL NEW ADDITION
11) NO ELECTRIC ON PLAN FOR EXISTING STORAGE
12) INSTALL BANG PLATES PLUMBING AND ELECTRICAL THROUGHOUT BOTH SIDES OF STUDS, PLATES, RAFTERS ETC.
13) ELECTRIC S.W. BEDROOM ADDITION NOT PER PLAN
14) INSTALL FIRE BLOCKS ALL FURR DOWNS
15) BEARING HEADERS MISSING TRIMMER STUDS
16) GAS PIPING ROOF NOT SUPPORTED TO MINIMUM CODE REQUIREMENT
17) SECURE POTABLE H20 LINES, H20 HEATER ? ROTATING
18) NEED VERIFICATION OF SOIL PIPE, SEWER, H20 REAR ADDITION
19) PLAN CALLS FOR USING EXISTING DUCT WORK-ALL NEW INSTALLED
20) NEED H20 TEST DWV THROUGH ROOF
21) INSTALL DRYER VENT TO EXTERIOR
22) INSTALL H20 HEATER FLU & COMB/RELIEF VENTS TO EXTERIOR
23) STOPPED INSPECTION: NEED ENGINEER STATEMENT REGARDING SUB-STANDARD FOUNDATION, WALLS, ETC...
24) STOP ALL WORK UNTIL RECTIFIED
05/12/2006 EXCAVATION/LAYOUT REBAR & ZON Denied IVRS - Inspection :
See detailed listing on site.| 999*
1) NEED ENGINEERED REPAIR ON SUBSTANDARD FOUNDATION WITH SPECIAL INSPECTION ON SAME
2) NEED TO REPLAC TERMITE DAMAGED WOOD
3) SECURE ROMEX WITH 12" OF BOXES
4) DUCT WORK HANGING OUT OF CEILING
5) NEED TEST DWV PIPING
6) BACK GROUT TUB
7) STOPPED INSPECTION-UNABLE TO LOCATE PLANS
05/08/2006 EXCAVATION/LAYOUT REBAR & ZON Not ready for Inspection IVRS - Inspection :*