Inspection Status: Approved

Inspection History: ENGINEERING - FINAL

Date Description Inspector Results Comments
02/12/2007 ENGINEERING - FINAL Approved
02/07/2007 ENGINEERING - FINAL Partial Approval LAST ITEM OUTSTANDING IS STABILIZATION
HARROW ON SITE AND HYDROSEEDING WILL TAKE 1.5 DAYS
11/21/2006 ENGINEERING - FINAL Denied SPOKE TO RUBEN 471-4621

ADDRESS:
KEYNOTE #4 STABILIZE ALL DISTURBED AREAS (LAND USE CODE 3.7.2.7)
INSTALL TRUNCATED DOMES PER SITE PLAN
INSTALL STRIPING PER PLAN