Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - INTERMEDIATE
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/03/2006 | PLUMBING - INTERMEDIATE | Approved | IVRS - Inspection :* | |
| 05/02/2006 | PLUMBING - INTERMEDIATE | Partial Approval | IVRS - Inspection :* PROVIDE SEALANT AT HAND SINK TO COUNTERTOP CONNECTION. SUPPORT OVERHEAD HORIZONTAL PLASTIC VENT AT EVERY 4' SUPPORT PVC AND ABS INDIRECT WASTE PIPING AT FLOOR SINK. REMOVE SHARP EDGES FROM UNISTRUT. PEX TUBING SHALL HAVE CLAMPS THAT ARE DESIGNED FOR USE W/PEX. COPPER TWO CLAMPS ARE NOT INTENDED FOR USE W/PEX. EACH ICEMAKER AND NON-CARBONATED BEVERAGE DISPENSER SHALL HAVE A SEPARATE DOUBLE CHECK BACKFLOW PREVENTION ASSEMBLY. WATER SUPPLY TUBING SHALL NOT BE CONNECTED TO THE TEST VALVES ON THE BACKFLOW ASSEMBLY. |