Inspection History Details
Inspection Status: Approved
Inspection History: ENGINEERING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/14/2007 | ENGINEERING - FINAL | Approved | -STABILIZE ALL AREAS PER LUC (done) -CLEAN UP WASHOUT WEST SIDE OF SITE (done) -REMOVE STOCKPILE EAST SIDE OF SITE (T07BU02275 is the stockpile permit for 9397 E Old Vail is approved but not yet issued.) -REMOVE BARRICADES(done) -REMOVE PORTA TOILET(done) -CLEAN UP ALL CONSTRUCTION DEBRIS(done) -PLACE BICYCLE PARKING PER PLAN 2-CLASS II (done) -ALL DRAIN/DOWNSPOUTS TO BE ROUTED UNDER SIDEWALK(Per phone call with Loren Makus drainage across sidewalk is acceptable. The parking blocks parallel to sidewalk fulfill the vertical separation for PAAL.) |
|
| 11/07/2007 | ENGINEERING - FINAL | Not ready for Inspection | -STABILIZE ALL AREAS PER LUC -CLEAN UP WASHOUT WEST SIDE OF SITE -REMOVE STOCKPILE EAST SIDE OF SITE -REMOVE BARRICADES(done) -REMOVE PORTA TOILET(done) -CLEAN UP ALL CONSTRUCTION DEBRIS(done) -PLACE BICYCLE PARKING PER PLAN 2-CLASS II (done) -ALL DRAIN/DOWNSPOUTS TO BE ROUTED UNDER SIDEWALK |
|
| 10/29/2007 | ENGINEERING - FINAL | Not ready for Inspection | -STABILIZE ALL AREAS PER LUC -CLEAN UP WASHOUT WEST SIDE OF SITE (SAND TOO) -REMOVE STOCKPILE EAST SIDE OF SITE -REMOVE BARRICADES -REMOVE PORTA TOILET -CLEAN UP ALL CONSTRUCTION DEBRIS -PLACE BICYCLE PARKING PER PLAN 2-CLASS II -ALL DRAIN/DOWNSPOUTS TO BE ROUTED UNDER SIDEWALK |
|
| 10/29/2007 | ENGINEERING - FINAL | Not ready for Inspection | MET WITH LOREN MAKUS AND STEVEN SHEILDS -SIDEWALK AT EAST SIDE OF BLDG SOUTH OF GATE AREA IS FLUSH WITH ASPHALT (NOT PER PLAN) A VERTICAL BARRIER MUST BE PLACED IN ORDER TO MEET CODE FOR SEPARATION OF VEHICULAR AND PEDESTRIAN TRAFFIC -ALL DRAINAGE IS TO BE ROUTED UNDER SIDEWALK THIS PLAN HAS AN ASSOCIATED GRADING PLAN T06BU00887 DCC (EOR) NEEDS TO CONSULT WITH ENGINEERING AND ZONING REVIEWERS FOR REQUIREMENTS FOR CHANGES IE NEW DEVELOPMENT PLAN, GRADING PLAN, SITE PLAN, ETC. BUILDING OFFICAL HAS FINAL DECISION TO GRANT OR DENY TEMPORARY C OF O. ALL WORK MUST BE ABLE TO BE COMPLETED WITHIN 30 DAYS IN ORDER TO BE ELIGIBLE FOR TEMP C OF O. |
|
| 10/26/2007 | ENGINEERING - FINAL | Not ready for Inspection | -STABILIZE ALL AREAS PER LUC -CLEAN UP WASHOUT WEST SIDE OF SITE (SAND TOO) -REMOVE STOCKPILE EAST SIDE OF SITE -REMOVE DUMPSTER AND BARRICADES -DAMAGED CONCRETE AND TRUNCATED DOMES -CLEAN UP ALL CONSTRUCTION DEBRIS -PLACE BICYCLE PARKING PER PLAN 2-CLASS II -ALL DRAIN/DOWNSPOUTS TO BE ROUTED UNDER SIDEWALK |