Inspection History Details
Inspection Status: Approved
Inspection History: ENGINEERING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/17/2007 | ENGINEERING - FINAL | Approved | ||
| 08/21/2007 | ENGINEERING - FINAL | Partial Approval | IVRS - Inspection :* | |
| 08/20/2007 | ENGINEERING - FINAL | Partial Approval | TEPORARY C OF O APPROVED AT THIS TIME. FINAL NOT TO BE GIVEN UNTIL ALL OF THE PREVIOUS NOTED COMMENTS HAVE BEEN COMPLETED AND APPROVED. 1) REMOVE ALL CONSTRUCTION DEBRIS. 2)REMOVE THE TEMPORARY STORE SHED. 3) COMPLETE THE PARKING LOT STRIPING. 4) ENSURE THAT ALL OF THE SILT FROM THE BASIN HAS BEEN REMOVED AND THAT THE SLOPES ARE AS PER THE APPROVED PLANS. |
|
| 08/15/2007 | ENGINEERING - FINAL | Denied | Project not ready, finish all items prior to final C of O. Preliminary list discussed with contractor; 1) Remove all construction debris 2) Remove construction dumpster 3) Remove temporary construction storage shed 4) Remove temporary store shed and storage. 5) Complete parking lot Stripping 6) Remove silt from basin and dress slopes. |