Inspection History Details
Inspection Status: Approved
Inspection History: FRAMING
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/26/2008 | FRAMING | Approved | IVRS - Inspection :* | |
| 09/18/2008 | FRAMING | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) REVISE PLAN TO SHOW EVAP COOLER AND CHANGE TO FURNACE 2) GROUND METAL BOXES 3) MAKE UP ALL SWITCHES PIG TAIL GROUNDS 4) NAIL PROTECT PLUMBING THROUGHOUT WITHIN 1 1/2" STUD EDGE 5) SECURE ROMEX 8" FROM BOXES THROUGHOUT 6) COMPLETE AIR HANDLER ? 7) MOVE ITEMS FOR STORAGE TO COMPLETE INSPECTION 8) STOPPED INSPECTION |