Inspection History Details
Inspection Status: Approved
Inspection History: EXCAVATION/LAYOUT REBAR & ZON
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/14/2006 | EXCAVATION/LAYOUT REBAR & ZON | Approved | IVRS - Inspection :* | |
| 07/25/2006 | EXCAVATION/LAYOUT REBAR & ZON | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) INCORRECT VENTING, INSTALL 2 WAY CLEANOUT OUTSIDE OF STRUCTURE 2) NEED 10' HEAD WALL WATER TEST |
|
| 07/11/2006 | EXCAVATION/LAYOUT REBAR & ZON | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) INSTALL DBL STACK 2-WAY CLEANOUT AND TIE ALL SOIL PIPE INTO IT AND INSTALL INFLATABLE TEST BALL AND WATER TEST WITH 10' HIGH PIPE 2) MUST SEPERATE REBAR DRIVEN INTO GROUND FROM HORIZONTAL STRUCTURAL REBAR 3) CANNOT HAVE PLUMBING PIPING RUNNING HORIZONTALLY IN FOOTING 4) VERTICAL PLUMBING PIPING TO BE INSTALLED VERTICALLY 5) SQUARE UP DIRT UNDER FORMS TO ALLOW CONCRETE POUR TO FILL SPACE VERTICALLY UNDER FORMS 6) STOPPED INSPECTION |