Inspection History Details
Inspection Status: Approved
Inspection History: FRAMING
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/12/2006 | FRAMING | Approved | IVRS - Inspection :* | |
| 10/11/2006 | FRAMING | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) 1" CLEARANCE FROM COMBUSTIBLE REQUIRED AT B-VENT, WATER HEATER AND FURNACE |
|
| 10/09/2006 | FRAMING | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) ADD STUD UNDER TRUSS BY REF. LINE 1ST FLOOR 2) 2ND FLOOR GIRDER SHALL BE TRANSFERED CONTINOUS TO 1ST FLOOR 3) SECURE WATER LINE AT S.O.V. 4) LEAK AT WASTE LINE 2ND FLOOR 5) 1" CLEARANCE FROM COMBUSTIBLE REQUIRED AT B-VENT AT WATER HEATER AND FURNACE 6) EXTEND DRYER VENT TO T-CAP 7) REDO/REPLACE OVER NOTCHED STUDS AT INTERIOR BEARING/SHEARWALL |