Inspection History Details
Inspection Status: Approved
Inspection History: ENGINEERING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/19/2007 | ENGINEERING - FINAL | Approved | SITE WAS CHECKED FOR FINAL RELEASE. THIS BUILDING HAS BEEN APPROVED FOR THE C OF O AT THIS TIME. THERE ARE DOWN DRAINS THAT EMPTY ONTO THE SIDEWALK, THESE ISSUES WILL BE ADDRESSED AND REPAIRED AS NEEDED AND DIRECTED. DUE TO THE AGE OF THE BUILDINGS PORTIONS OF THE DRAINAGE ISSUES MAY NEED TO BE ALLOWED SINCE THE CODE MAY HAVE NOT REQUIRED THE FLOWS NOT TO IMPEED PEDESTRIAN TRAFFIC AREAS. THIS WILL BE ADDRESSED WITH THE BUILDING OFFICIAL PRIOR TO THE FINAL C OF O'S BEING GRANTED ON ALL OTHER BUILDINGS. | |
| 02/14/2007 | ENGINEERING - FINAL | Denied | MEETING WITH STEVE TOUFEL AND GEORGE SCHLEGEL (623-203-2991),OF TOUFEL CONSTRUCTION) AND JIM FEMLING TO DISCUSS PHASED PLAN FOR TEMPORARY OCCUPANCIES OF MODELS DURING CONSTRUCTION. NOT READY FOR INSPECTION 1. COMPLETE SITE WORK PER FIELD PHASED SITE PLAN. 2. PROVIDE A DESIGNATED CONCRETE WASH DOWN AREA. 3. SWEEP STREETS AND PROVIDE SWPP CONTROLS TO PREVENT POLLUTION OF STORMWATER RUNOFF. |
|
| 02/13/2007 | ENGINEERING - FINAL | Denied | NOT READY FOR INSPECTION |