Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/24/2007 | PLUMBING - FINAL | Approved | IVRS - Inspection :* | |
| 07/20/2007 | PLUMBING - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999 UNITS 5343, 5344, 5244 AND 5135 ONLY ONE SLIP NUT ALLOWED ON STRM OF P-TRAP RE DAP FIXTURES |
|
| 07/18/2007 | PLUMBING - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* SHWR HEADS DRY WELLS KEEP EXTERIOR C O'S EXPOSED 3 UNITS INSPECTED |
|
| 07/12/2007 | PLUMBING - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* 5143 -- SERVICE VALVE MISSING HANDLE 5141 -- T&P TERMINATION AT DIRT LEVEL, REMOVE DIRT AND PROVIDE DRAINAGE. A DRY WELL IS NOT NEEDED BECAUSE BUILDING IS HIGHER THAN SURROUNDING GRADE 5154 -- HB VACUUM BREAKER INSPECTION STOPPED THIS IS THE 4TH DENIED FINAL INSPECTION CONTRACTOR SHALL PAY RE-INSPECTION FEE PRIOR TO NEXT INSPECTION |
|
| 06/29/2007 | PLUMBING - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1. SHOWER HEAD CONNECTIONS LEAKING 2. EMERGENCY SHOWER VALVES SHALL BE OPERATIONAL, INSTALL HANDLES 3. DRY WALL NOT COMPLETED 4. DOORS LOCKED 5. UNABLE TO LOCATE CONTRACTORS 6. NEED PLANS 7. CONTINUED DENIED INSPECTION RESULTS WILL RESULT IN REINSPECTION FEES |
|
| 06/27/2007 | PLUMBING - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* PAINT ALL EXPOSED PLASTIC VENT TERMINATIONS AND DRAIN PAN SERVICE SHUT OFF VALVES SHALL BE OPERATIONAL ALL CLEANOUT PLUGS SHALL BE MADE WATER & GAS TIGHT WITH THE USE APPROVED THREAD SEALANT. TRIM SCREW TO CORRECT LENGTH - DO NOT ALTER PLUG T&P BLOCKED 5238, 5137 INSTALL DRY WELLS W/RIVER ROCK WHERE EXISTING INSTALLATION WARRANTS. |
|
| 06/25/2007 | PLUMBING - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* |