Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - INTERMEDIATE
Permit Number - T06CM01868
Inspection Description - PLUMBING - INTERMEDIATE
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
10/23/2006 | PLUMBING - INTERMEDIATE | Approved | IVRS - Inspection :* | |
06/01/2006 | PLUMBING - INTERMEDIATE | Partial Approval | IVRS - Inspection :* | |
05/26/2006 | PLUMBING - INTERMEDIATE | Partial Approval | IVRS - Inspection :* 4 RPA'S AND 4 DC HAVE BEEN INSTALLED AND CERTIFIED. THEY HAVE NOT YET BEEN CONNECTED TO ANY EQUIPMENT. CERTS. LEFT ON JOB. YOU MAY CONNECT THESE TO YOUR BEVERAGE DISPENSERS, ONLY ONE DEVICE PER WATER CONNECTION. YOU MAY USE YOUR DISPENSERS AFTER CONNECTING. YOU WILL NEED TO LABEL EACH DEVICE. YOU WILL NEED FOUR MORE DEVICES TO SERVE ALL DISPENSERS. AFTER INSTALLING AND TESTING THESE YOU MAY USE YOUR DISPENSERS. CORRECTLY INSTALL PVC DISPENSER DRAINS. HAND SINK PIPING NOT COMPLETE. |
|
05/24/2006 | PLUMBING - INTERMEDIATE | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1. INSTALL PLUMBING PER YOUR APPROVED PLAN WITH TEST ON DRAINAGE PIPING & VENT. WITHOUT COVERING ANY WORK. WORK IS COVERED IN SOME AREAS AND BEING USED. 2. INSTALL BACKFLOW PROTECTION THAT IS REQUIRED FOR ALL FIXTURES REQUIRING IT. PRIOR TO USING ANY NEW APPLIANCES. PROVIDE CERTIFICATIONS. 3. PROVIDE APPROVED COUPLINGS AND CORRECT SUPPORTS AT CORRECT INTERVALS ON ALL PIPING. 4. PROVIDE CORRECT TRANSITION FITTINGS FOR DISSIMILAR MATERIALS. 5. ALL DRAINAGE PIPING REQUIRES 1/4" PER FOOT MINIMUM FALL AND SHALL BE SUPPORTED AT CORRECT INTERVALS FOR MATERIAL TYPE. 6. INDIRECT DRAIN SHALL TERMINATE WITH MINIMUM 1" AIR GAP. 7. THE BEVERAGE DISPENSERS IN THIS FACILITY SHALL NOT BE USED TO DISPENSE TO ANYONE UNTIL THIS ISSUE HAS BEEN TAKEN CARE OF. THIS ISSUE SHALL BE FOLLOWED UP ON AND CORRECTED WITHIN 1 WEEK OF THIS INSPECTION DATE. THESE DISPENSERS INCLUDE COFFEE, CAPPUCINO, ICE MACHINES AT FOUNTAIN AREA, SODA DISPENSERS, FROSTER ICE MACHINES. NOTIFIED CONTRACTOR AND ANNA MANAGER OF PROPERTY. |