Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - ROUGH, SOIL
Permit Number - T06CM01816
Inspection Description - PLUMBING - ROUGH, SOIL
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
02/07/2007 | PLUMBING - ROUGH, SOIL | Approved | IVRS - Inspection :* | |
02/06/2007 | PLUMBING - ROUGH, SOIL | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) HAND SINK IS OK TO COVER IN WALL IF YOU CHANGE SPEC 3 REQUIRING PIPE INSULATION ON HW AND CW PIPING 2) PROVIDE A MINIMUM OF 1/4" PER FOOT SLOPE ON HORIZONTALLY DRAINS 3) TEST ALL NEW DRAIN AND VENT PIPING TO CEILING LEVEL 4) VENT TAKE OFF ON HORIZONTAL VENTING SHALL BE TAKEN OFF ABOVE FLOW LINE OF DRAIN ROLL WYE UP TO AT LEAST 45 DEGREE |
|
02/05/2007 | PLUMBING - ROUGH, SOIL | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) PROVIDE 2 PERCENT SLOPE IN ALL AREAS, GT DRAIN IS FLAT 2) PROVIDE PROPER VENTING ON FS 3) DO A NEATER JOB ON WRAPS-NO PLASTIC SHOWING WHERE PASSING THROUGH CONCRETE 4) RED LINE ALL CHANGES ON PLAN 5) COPPER IN RESTROOMS OK 6) CAP OPEN SEWER PIPES DURING CONSTRUCTION 7) HAND SINK OK |