Inspection History: PLUMBING - ROUGH, SOIL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/07/2008 | PLUMBING - ROUGH, SOIL | Approved | IVRS - Inspection :* | |
| 04/27/2007 | PLUMBING - ROUGH, SOIL | Partial Approval | IVRS - Inspection :* ROUGH SOIL PIPING W/TEST AND FOAM WRAPS OK TO COVER PROVIDE PLAN REVISION FOR FINAL APPROVAL |
|
| 04/24/2007 | PLUMBING - ROUGH, SOIL | Not ready for Inspection | 1. POST YOUR ADDRESS 2. TRAILER LOCKED UNABLE TO ACCESS PLAN OR PERMIT |
|
| 04/19/2007 | PLUMBING - ROUGH, SOIL | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1. UPPER TERMINAL MAIN HAS FLAT SPOTS. 2. SOUTHEASTERN WC IS FLAT. 3. USE REBAR CROSS BRACE IF NECESSARY TO SUPPORT BRANCHES AT FOOTINGS. 4. 2" BRANCH LINE ON EAST END IS FLOATING ON LARGE DIRT CLOGS. 5. SUPPORT BELOW GRADE PIPING CONTINUOUSLY W/CLEAN COMPACTED FILL. 6. LETTER FOR SLOPE & TYPE OF VENTING OK FOR CONTINUATION OF WORK, BUT PLAN SHALL BE REVISED PRIOR TO FINAL APPROVAL. |
|
| 04/18/2007 | PLUMBING - ROUGH, SOIL | Denied | IVRS - Inspection : See detailed listing on site.| 999* BACKPITCH PRESENT IN SEVERAL LOCATIONS SUPPORT PIPING W/COMPACTED DIRT |
|
| 04/11/2007 | PLUMBING - ROUGH, SOIL | Denied | IVRS - Inspection : See detailed listing on site.| 999* TEMP HBS REQUIRE VAC BREAKERS FOR USE PROVIDE UNIFORM SLOPE IN ALL AREAS REMOVE CHUNKS 1/4" PER SLOPE IS REQUIRED EXCEPT THAT 4" MAY BE INSTALLED AT 1/8" WITH PRIOR APPROVAL CONVENTIONAL VENTING IS REQUIRED UNLESS STRUCTURAL CONDITIONS APPLY REVISE PLAN IF INSTALLING AT LESS THAT 1/4" AND IF HORIZONTAL VENTING IS NECESSARY. ALSO, REDLINE OR REVISE CHANGES SUCH AS LOCATION OF WASTE PIPING WHEN NOT PER PLAN. |