Inspection History Details
Inspection Status: Approved
Inspection History: ENGINEERING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/10/2008 | ENGINEERING - FINAL | Approved | ||
| 12/09/2008 | ENGINEERING - FINAL | Not ready for Inspection | 1) PATCH ALL SIDEWALK AREAS - TO INCLUDE REPAIR OF BROKEN SECTIONS AND CURBING 2) COMPLETE INSTALLATION OF ALL ROOF DRAINS AROUND BLDG. 3) REMOVE ANY REMAINING CONSTRUCTION DEBRIS AND EQUIPMENT |
|
| 11/07/2008 | ENGINEERING - FINAL | Partial Approval | Items 4,7,8,10,11 from punch list dated 10/30 completed. Items 1,2,3,5,6,9 still need to be completed as well as replace HC ramp at SE corner of Bldg, slope to steep to the west access. Remove dumpster and all construction debris. The above items must be completed prior to final. |
|
| 10/30/2008 | ENGINEERING - FINAL | Denied | COMPLETE THE FOLLOWING ITEMS PRIOR TO APPROVAL FOR C OF O FROM ENGINEERING: 1) FINAL GRADING PERMIT #T06BU00572. 2) COMPLETE ALL SITE WORK PER APPROVED PLAN. 3) INSTALL ROOF DRAINS W/ FRENCH DRAINS PER NOTE#5 ON APPROVED PLANS. 4) INSTALL DRAINAGE SWALE PER NOTE#17 ON PLANS. 5) INSTALL GATES ON TRASH ENCLOSURE PER COT DEV STD. 6) INSTALL HC PARKING PER APPROVED PLANS, NOTE #9 7) PROVIDE WHEEL STOPS AT HC PARKING PER PLAN. 8) INSTALL ROCK RIP RAP AT CURB OPENING NOTE #28 9) INSTALL CLASS #1 BIKE PARKING, NOTE #20 10) ANCHOR EXISTING CLASS #2 BIKE PARKING TO CONCRETE 11) INSTALL RETAINING WALL PER DETAIN "D" ON PAGE C-3 OF PLANS. |