Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - INTERMEDIATE
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/23/2008 | PLUMBING - INTERMEDIATE | Approved | IVRS - Inspection :* 1. NO APPROVED GAS PLAN ON SITE. HAVE REVISED GAS PLAN APPROVED AND ALL AS-BUILT SIZES VERIFIED FOR ENGINEERING 2. WILL REQUIRE LETTER AS NOTED ON 7/16/08 3. WILL REQUIRE PLAN REVISION FOR AS-BUILT FROM 2/9/08 4. WILL REQUIRE STERILIZATION AND CLEAN BACTERIA REPORT FOR FINAL |
|
| 07/22/2008 | PLUMBING - INTERMEDIATE | Partial Approval | IVRS - Inspection :* CLOSET FLANGES 2ND FLOOR OK |
|
| 07/16/2008 | PLUMBING - INTERMEDIATE | Partial Approval | IVRS - Inspection :* 1. ENGINEER HAS ACCEPTED INSULATION IN THE CORRIDORS ONLY. PROVIDE LETTER FROM OWNER ACCEPTING AS BUILT CONDITION - OWNER IS AWARE OF I.E.C.C REQUIREMENTS 2. CLOSET FLANGES TO EXTEND 1/4" ABOVE FINISHED FLOOR FLANGES TO BE SECURE 3. INSULATION FIRST AND SECOND FLOOR CORRIDORS ONLY OK TO COVER SUBJECT TO OWNERS LETTER |
|
| 07/15/2008 | PLUMBING - INTERMEDIATE | Not ready for Inspection | IVRS - Inspection :* 1. CLOSET FLANGES TO BE SECURE. CLOSET FLANGES TO EXTEND 1/4" ABOVE FINISH FLOOR. CLOSET FLANGES TO BE FULLY SOCKETED INTO PIPE OR INTO FITTING. PIPE SHALL BE FLUSH WITH THE TOP OF THE FLANGE. IT SHALL PRESENT A SMOOTH INTERIOR WATERWAY 2. PLAN SPECS AND I.E.C.C REQUIRE THAT ALL HOT AND ALL RECIRC. PIPING TO BE INSULATED |
|
| 07/14/2008 | PLUMBING - INTERMEDIATE | Denied | IVRS - Inspection : See detailed listing on site.| 999* THIS INSPECTION FOR CLOSET FLANGES & ABOVE CEILING, CLOSET FLANGES TO BE SET ON FINISH FLOOR, TOP OF FLANGE 1/4" ABOVE FINISH FLOOR, FLANGE TO BE SECURED TO FLOOR WITH APP. FASTENERS, WITH FLUSH INTERIOR WATER WAY AND PIPE FLUSH TO TOP OF FLANGES. ABOVE CEILING PIPING TO BE SUPPORTED AT 32" INCREMENTS FOR PEX, PROPERLY INSULATED AND SEALED AND SUPPORTED. |
|
| 07/11/2008 | PLUMBING - INTERMEDIATE | Not ready for Inspection | IVRS - Inspection :* COMPLETE INSULATION FOR ARMOR FLEX STANDARDS |
|
| 07/03/2008 | PLUMBING - INTERMEDIATE | Not ready for Inspection | IVRS - Inspection :* 1. CORRIDOR PIPING ON THE FIRST FLOOR INCOMPLETE NO PROVISION MADE FOR INSULATION 2. CLOSET FLANGES 2ND FLOOR NOT SET CONTINUED "NOT READY" WILL RESULT IN REINSPECTION FEE |
|
| 03/12/2008 | PLUMBING - INTERMEDIATE | Partial Approval | IVRS - Inspection :* OK TO COVER ALL ROOMS 2ND & 3RD FLOOR NEED TO SEE CLOSET FLANGES |
|
| 02/20/2008 | PLUMBING - INTERMEDIATE | Not ready for Inspection | IVRS - Inspection :* | |
| 02/19/2008 | PLUMBING - INTERMEDIATE | Not ready for Inspection | IVRS - Inspection :* 1. PROVIDE TEST ON ALL PIPING FOR 2ND FLOOR 2. PROVIDE APPROVED PLANS FOR WATER PIPING & WASHER AND VENTS |
|
| 02/01/2008 | PLUMBING - INTERMEDIATE | Not ready for Inspection | IVRS - Inspection :* | |
| 01/15/2008 | PLUMBING - INTERMEDIATE | Partial Approval | IVRS - Inspection :* 1. TUBS & SHOWERS FIRST FLOOR OK 2. OK TO COVER UNIT WALLS 3. WILL INSPECT CORRIDOR AT A LATER DATE 4. CLOSET FLANGES FIRST FLOOR OK |
|
| 10/26/2007 | PLUMBING - INTERMEDIATE | Partial Approval | IVRS - Inspection :* OK TO PRE-ROCK FIRST FLOOR WILL REINSPECT FIRST FLOOR AFTER TUBS AND SHOWERS CONTRACTOR WILL SUPPORT ALL STUB OUTS |
|
| 09/26/2007 | PLUMBING - INTERMEDIATE | Partial Approval | IVRS - Inspection :* COURTESY INSPECTION FOR INTERMEDIATE |