Inspection History Details
Inspection Status: Approved
Inspection History: ENGINEERING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/17/2009 | ENGINEERING - FINAL | Approved | ALL ITEMS ON PUNCH LIST HAVE BEEN ADDRESSED. | |
| 05/21/2009 | ENGINEERING - FINAL | Correction Required | PRELIMINARY PUNCH LIST-- CONTRACTOR NEEDS TO ADDRSS THE FOLLOWING ITEMS: 1) ACCESS POINT OFF OF UTAH NEEDS TO BE ADA COMPLIANT 2) TRASH ENCLOSURE NEEDS PILOT HOLD AND BALLARDS NEED TO BE PAINTED PER COT STANDARD DETAIL 3) BASIN CERTIFICATION LETTER IS NECESSARY 4) IF BASIN DEPTH IS MORE THAN 2' HANDRAIL NEEDS TO BE INSTALLED AND SIDE SLOPES NEED TO BE ADDRESSED |