Inspection History Details
Inspection Status: Approved
Inspection History: FRAMING
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/06/2006 | FRAMING | Approved | IVRS - Inspection :* | |
| 06/26/2006 | FRAMING | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) STUCCO LATHE NOT NAILED AT 6" ON CENTER MANY LOCATIONS 2) NO DWV WATER TEST 3) YOU MUST INSTALL GAS LINE PER PLAN OR HAVE GAS LINE REMOVED FROM YOUR PLAN AND PERMIT 4) THIS HOUSE HAS BEEN FRAMED WITH UNDERSIZED FRAMING NAILS. THIS HOUSE FRAMED WITH 3" X .131 10D NAILS WHERE 16D ARE REQUIRED. HAVE ENGINEER OF RECORD EVALUATE STRUCTURE AND PROVIDE REPORT-CORRECTION TO CITY OF TUCSON 5) PROVIDE U 46 HGRS AT PANTRY HEADER 6) ANCHOR SECOND FLOOR SIL PLATE 7) MAX ALLOWED LAV DIRTY ARM 1 1/2"-2" INSTALLED |