Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - INTERMEDIATE
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/14/2006 | PLUMBING - INTERMEDIATE | Approved | IVRS - Inspection :* | |
| 07/24/2006 | PLUMBING - INTERMEDIATE | Partial Approval | IVRS - Inspection :* 1. HORIZONTAL X HORIZONTAL CHANGE OF DIRECTION TO BE A SWEEP. 2. 1 1/2" TRAP ARM MAY NOT EXCEED 3'6" 3. INSULATE HOT PIPING PER 2000 IEC 4. ABS TO BE SUPPORTED AT EACH CHANGE OF DIRECTION OR ELEVATION. 5. PROVIDE MID STORY GUIDES ON VERTICAL. |