Inspection History Details
Inspection Status: Approved
Inspection History: ROOF NAILING
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/07/2006 | ROOF NAILING | Approved | IVRS - Inspection :* | |
| 08/31/2006 | ROOF NAILING | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) NUMBERS 2 & 5 STILL NOT COMPLIED WITH. IF YOU DO NOT UNDERSTAND THESE ITEMS, YOU NEED TO ARRANGE A MEETING AT THE SITE WITH THE INSPECTOR. IF ANOTHER INSPECTION IS CALLED FOR, WITHOUT NUMBERS 2 & 5 BEING COMPLIED WITH, YOU WILL BE ISSUED A RE-FEE CHARGE |
|
| 08/29/2006 | ROOF NAILING | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) NUMBERS 2 AND 5 FROM INSPECTION DONE ON 8/29/06 NOT COMPLIED WITH |
|
| 08/24/2006 | ROOF NAILING | Denied | IVRS - Inspection : See detailed listing on site.| 999* |
|
| 08/22/2006 | ROOF NAILING | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) COUPLE ROWS OF ROOF NAILING MISSED ON EAST PLANE AND ALONG FASCIA 2) NEED ADDITIONAL FRAME/RAFTER SUPPORT AT EXISTING ROOF-SOUTH PLANE 3) ADD ADDITIONAL FRAME SUPPORT TO NEW SOUTH ROOF PLANE WHERE IT SAYS (DO NOT STEP) 4) PROVIDE PLAN DETAILS FOR COMMON RAFTER PLATE ATTACHMENT TO EXISTING ROOF SOUTH PLANE 5) PROVIDE PLAN DETAILS FOR COMMON RAFTER PLATE ATTACHMENT TO EXISTING ROOF AND RAFTER ATTACHMENT TO PLATE. ALSO PLATE SIZE REQUIREMENT, AS RAFTERS HAVE LITTLE BEARING 6) NOTE: PROVIDE ACCESS HOLE FROM NEW ATTIC TO EXISTING ATTIC-PER PLAN AFTER DRY IN |