Inspection History Details
Inspection Status: Approved
Inspection History: ELECTRIC - FINAL
Permit Number - T06CM01565
Inspection Description - ELECTRIC - FINAL
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
04/04/2007 | ELECTRIC - FINAL | Approved | IVRS - Inspection :* | |
03/30/2007 | ELECTRIC - FINAL | Not ready for Inspection | IVRS - Inspection :* 1. SECURE CABLES AT PANEL 12" FROM PANEL & EVERY 6' AFTER. 2. CANNOT USE SHEETMETAL SCREW FOR GROUNDING GROUND METAL BOX PER NEC 250 3. CHECK STRAPPING OF MC CABLES WITHIN 12" OF CONNECTION POINTS & EVERY 6' AFTER 4. CHECK EXITS FOR PROPER OPERATION 5. CHECK EM LIGHTS FOR PROPER OPERATION 6. CHECK ALL BOXES GROUNDED PER NEC 250 7. OVERFILL ON 4" SQUARE BOX EAST HALL 8. EGRESS LIGHTING NEEDS TO BE WIRED 9. INSTALL PANEL DIRECTORY 10. CONNECT GROUNDING ELECTRODE CONDUCTOR TO PANEL GROUND BAR 11. BOND BUILDING STEEL 12. CONNECT GROUND AT SWAMP COOLER OUTLET BOXES 13. SJ CORD FOR SWAMP COOLERS MARKED FOR INDOOR USE ONLY. |