Inspection History Details
Inspection Status: Approved
Inspection History: ELECTRIC - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/04/2007 | ELECTRIC - FINAL | Approved | IVRS - Inspection :* | |
| 03/30/2007 | ELECTRIC - FINAL | Not ready for Inspection | IVRS - Inspection :* 1. GROUND ALL METAL BOXES PER NEC 250 2. CANNOT FEED THROUGH A/C DISCONNECT TO 2ND DISCONNECT PER NEC 312.8 3. NEED PROPER WORKING CLEARANCE AT A/C DISCONNECT PER 110.26 4. SEAL OPEN KNOCKOUT AT A/C DISCONNECT 5. BOND BUILDING STEEL TO PANEL PER NEC 250 6. INSTALL FILLER PLATES IN PANEL DEAD FRONT 7. EXIT & EM LIGHTS NOT OPERATING PROPERLY. 8. INSTALL COVER ON RECEPT EAST END OF BUILDING. |