Inspection History Details
Inspection Status: Approved
Inspection History: ELECTRIC - TEMP POWER FOR TEST
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/14/2007 | ELECTRIC - TEMP POWER FOR TEST | Approved | IVRS - Inspection :* 1) WILL LOOK FOR CORRECT SCREWS ON PANEL COVER 4-B |
|
| 03/12/2007 | ELECTRIC - TEMP POWER FOR TEST | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1. CORRECT ADDRESS 2. PROVIDE LETTER ON CHANGE FROM COPPER TO DRUM AT SERVICE. 3. PROVIDE MAIN BONDING SCREW AT DISCONNECT 4. USE CORRECT WIRING METHOD AT METER BOND BUSHING 5. FUSES CALLED OUT FOR ARE LPN RK, FULL BLADE CONTACT 6. CORRECTLY CLAMP LOOSE BREAKER IN 400A PNL 7. FINISH J-BOX - GUTTER ABOVE PNL, INCLUDING GROUNDING TO BUSHING. 8. PNL 4-B BUSHING REG ON FEE, TAPE GROUND, 70 AMP AC NEED #4 |