Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - INTERMEDIATE
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/29/2006 | PLUMBING - INTERMEDIATE | Approved | IVRS - Inspection :* | |
| 08/28/2006 | PLUMBING - INTERMEDIATE | Partial Approval | IVRS - Inspection :* | |
| 04/20/2006 | PLUMBING - INTERMEDIATE | Denied | IVRS - Inspection : See detailed listing on site.| 999* EACH CARBONATOR REQUIRES RPA BACKFLOW PROTECTION EACH NON CARBONATED BEVERAGE REQUIRES DCVA PROTECTION EACH ICE MAKER REQUIRES DCVA BACKFLOW PROTECTION. EACH ASSEMBLY REQUIRES CERTIFICATION. INDIRECT WASTE PIPING SHALL BE INSTALLED ACCORDING TO CHAPTER 8 UPC 2003 SEE SEC 801.2.3 EACH INDIRECT WASTE PIPE USED FOR THE STORAGE OF UNPACKAGED ICE SHALL BE SEPARATELY PIPED TO THE INDIRECT WASTE RECEPTOR AND SHALL NOT COMBINE WITH OTHER INDIRECT WASTE PIPES. INDIRECT WASE PIPING USED FOR DISPENSER DRAINS AND CONDENSATES MAY COMBINE. USE DRAINAGE FITTINGS AND PROVIDE CLEANOUTS AT EACH CHANGE OF DIRECTION. CONDENSATES FOR EVAPORATOR UNITS REQUIRE A TRAP PER PLAN DETAIL. THESE CONDENSATE DRAINS REQUIRE A MECHANICAL INSPECTION. |