Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - ROUGH, SOIL
Permit Number - T06CM01543
Inspection Description - PLUMBING - ROUGH, SOIL
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
05/04/2006 | PLUMBING - ROUGH, SOIL | Approved | IVRS - Inspection :* | |
05/03/2006 | PLUMBING - ROUGH, SOIL | Denied | IVRS - Inspection : See detailed listing on site.| 999* THE CORRECTIONS FROM THE PREVIOUS INSPECTION HAVE NOT BEEN MADE. |
|
05/01/2006 | PLUMBING - ROUGH, SOIL | Denied | IVRS - Inspection : See detailed listing on site.| 999* UPC 314.3 -- "PIPING IN GROUND SHALL BE LAID ON A FIRM BED FOR ITS ENTIRE LENGTH" PROVIDE SHADING OF PIPING WITH CLEAN COMPACTABLE FILL THAT DOES NOT CONTAIN ROCKS OR CHUNKS LARGER THAN 3/4". UPC 708 -- HORIZONTAL DRAINAGE PIPING SHALL BE RUN IN PRACTICAL ALIGNMENT AND A UNIFORM SLOPE OF NOT LESS THAN 2%". SUPPORT BRANCH AT WC. UPC SEC 314.3 -- ALSO APPLIES TO YARD WATER PIPING. TUBING SHALL BE INSTALLED IN ACCORDANCE WITH MANUFACTURERS SPECIFICATIONS WHICH REQUIRE BEDDING, SHADING AND HAUNCHING AND SHALL COMPLY WITH UPC SECTIONS 310.3 --- 316.1.2, 316.1.2.3, 316.1.2.9 AND 609.4 REAM ALL TUBING! PROVIDE A PRESSURE TEST AND SHADE WITH CLEAN FILL TO 6" ABOVE PEX TUBING -- LEAVE JOINTS EXPOSED FOR INSPECTION. |