Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Inspection Status: Approved

Inspection History: BUILDING - FINAL

Permit Number - T06CM01461

Inspection Description - BUILDING - FINAL

Inspection Status - Approved

Date Description Inspector Results Comments
08/08/2008 BUILDING - FINAL Approved IVRS - Inspection :*
1) OK ON FINAL-JOB COMPLETE
07/31/2008 BUILDING - FINAL Denied IVRS - Inspection :
See detailed listing on site.| 999*
1) 35 AMP MAX FUSE FOR A/C #1 DISCONNECT
2) COVER H20 HEATER PLATFORM WITH METAL
3) VENT ON EAST SIDE STUCCOED SHUT
4) SEAL TOILETS AT FLOOR
5) POST TENSION TAG AT SPIGOT, IF APPLICABLE-POST TENSION CERT, INSULATION CERT AND STUCCO CERT
6) NEED TO INSPECT HEAT SOURCE (FURNACE) LOCATION ?
05/28/2008 BUILDING - FINAL Not ready for Inspection IVRS - Inspection :*
1) RAILINGS, STAIRS, OUTSIDE FIXTURES PROTECTED FOR LIGHTING ORDINANCE