Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - ROUGH, SOIL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/27/2007 | PLUMBING - ROUGH, SOIL | Approved | IVRS - Inspection :* | |
| 02/27/2007 | PLUMBING - ROUGH, SOIL | Denied | IVRS - Inspection : See detailed listing on site.| 999* READ ALL NOTES MAKE CORRECTIONS REQUIRED BY APPROVED PLAN & 2003 UPC REQUIRMENTS. FAILURE TO COMPLY SHALL RESULT IN REFEE. |
|
| 02/21/2007 | PLUMBING - ROUGH, SOIL | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1. SHALL PROVIDE REDLINE DRAWING ON SITE IF YOUR PIPING DIFFERS FROM YOUR APPROVED PLAN. MEETING 2003 UPC REQUIREMENTS. 2. SHALL PROVIDE CORRECT LONG RADIUS DRAINAGE FITTINGS (SANTEE ON BACK IS NOT) 3. ALL FIXTURES TO BE CORRECTLY VENTED. 4. ALL PIPING TO BE PROPERLY BEDDED & SHADED 5. TAILPIECE MAXIMUM LENGHT NOT TO EXCEED 2003 UPC REQUIREMENTS. 6. WATER PIPING TO BE INSTALLED PER PLAN AND WASTE & VENT PIPING. NOT COMPLETE LIST SHALL HAVE PLUMBER ON SITE FOR REINSPECTION |