Inspection History Details
Inspection Status: Approved
Inspection History: ELECTRIC - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/23/2006 | ELECTRIC - FINAL | Approved | IVRS - Inspection :* | |
| 08/15/2006 | ELECTRIC - FINAL | Denied | IVRS - Inspection : The wiring is not complete or does not comply with code.| 245* 1. EMERGENCY/EXIT LIGHTING IS NOT PER PLAN OR CODE NEC 700.12 (E) 2. INSTALL BOX EXTENDERS AS REQUIRED BY NEC 314.20 NOTE: WILL NEED TO PAY REINSPECTION FEE BEFORE FINAL APPROVAL IF NEXT TRIP NOT CORRECT. |
|
| 08/14/2006 | ELECTRIC - FINAL | Not ready for Inspection | IVRS - Inspection :* HAVE ELECTRICIAN ON SITE TO HELP WITH INSPECTION (WITH PLANS) LEAVE HIS NAME AND NUMBER WHEN FINAL IS CALLED AND I WILL GIVE HIM A CALL 1/2 HR PRIOR. |
|
| 07/17/2006 | ELECTRIC - FINAL | Not ready for Inspection | IVRS - Inspection :* CORRECTIONS HAVE NOT BEEN MADE |
|
| 07/13/2006 | ELECTRIC - FINAL | Denied | IVRS - Inspection : The wiring is not complete or does not comply with code.| 245* PARTIAL INSPECTION ONLY 1. CORRECTLY IDENTIFY PANEL DIRECTORY'S - NEC 408.4 2. EMERGENCY LIGHTING TO COMPLY WITH NEC 700.12(E) 3. USE BOX EXTENDERS AS REQUIRED BY NEC 314.20 4. HAVE ENCLOSURES OPEN FOR INSPECTION 5. CAN'T FINE NEW LOADS ON PLAN FOR PANEL CALCS? VALASKO ELECTRIC 744-1195 |
|
| 07/12/2006 | ELECTRIC - FINAL | Denied | IVRS - Inspection : The wiring is not complete or does not comply with code.| 245* 1. HAVE PLANS ON SITE 2. PROVIDE ATTIC ACCESS 3. HAVE CONTRACTOR ON SITE WITH PRIOR ELECTRICAL INSPECTION REPORTS. |