Inspection History Details
Inspection Status: Approved
Inspection History: MECHANICAL - INTERMEDIATE
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/16/2006 | MECHANICAL - INTERMEDIATE | Approved | IVRS - Inspection :* CORRECTIONS HAVE BEEN MADE OK FOR SHEETROCK |
|
| 10/09/2006 | MECHANICAL - INTERMEDIATE | Partial Approval | IVRS - Inspection :* UNIT #1 - CONDENSATE OVERFLOW PAN - OVERFLOW TERMINATE DRAIN ABOVE TOP PLATE ON WALL STRAIGHT OUT OF END GABLE. - LIVING RM. CEILING DIFFUSER - WRAP 90 DEG. SHT. MTL. FITTING EXTENDING UP INTO FLEX DUCT. BOTH UNIT #1 & #2 UNIT #2 TERMINATE OVERFLOW CONDENSATE ABOVE TOP WALL PLATE - THE PURPOSE OF SEPARATING PRIMARY AND SECONDARY OVERFLOW TERMINATIONS ON COND. PIPING IS TO ALERT OCCUPANT THAT PRIMARY IS BLOCKED AND NEEDS ATTN. THANKS CW |