Inspection History Details
Permit: T06CM01331
Inspection Status: Approved
Inspection History: PLUMBING - ROUGH, SOIL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/07/2006 | PLUMBING - ROUGH, SOIL | Approved | IVRS - Inspection :* 1. ABS DWV UNDER SLAB OK 2. CONTRACTOR TO WRAP BEFORE POURING. |
|
| 04/05/2006 | PLUMBING - ROUGH, SOIL | Not ready for Inspection | IVRS - Inspection :* 1. PLEASE POST YOUR ADDRESS ON RIVER RD. 2. PLEASE POST YOUR BLDG. NUMBERS SO THEY CAN BE SEE FROM A TRUCK. 3. IF YOU LEAVE A NAME AND CONTACT NUMBER WHEN SCHEDULING AN INSPECTION IT WILL AID THE INSPECTOR. 4. ALL PIPING TO BE INSTALLED AT 2% UNO PIPING TO BE ON A FIRM BED -- PIPING TO BE SHADED. 5. HAVE FIRST FLOOR PLUMBING OPTION ADDED TO APPROVED PLAN. |