Inspection History Details
Inspection Status: Approved
Inspection History: ROOF NAILING
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/19/2006 | ROOF NAILING | Approved | IVRS - Inspection :* | |
| 06/01/2006 | ROOF NAILING | Partial Approval | IVRS - Inspection :* 1) NAIL ROOF DECKING TO LEDGER 2) NEED NON-? 1" SPACER UNDER POSTS 3) USE 16D 2 1/2".162 DIAMETER NAILS IN LU HANGERS |
|
| 05/09/2006 | ROOF NAILING | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) WRONG SIZE NAILS IN HANGERS-NEED SCREWS. SEE PLAN CHECK FOR SIZE. NO NAILING FROM ROOF DECK TO LEDGER, NEED MECHANICAL CONNECTION 2) WRONG SIZE NAILS AT POST TO BEAM HARDWARE SEE SIMPSON CATALOG 3) NEED 1" GAP AT POST TO CONC. INSTALL A SPACER (NON WOOD) 4) ROOF DECK COVERED NO INSPECTION MADE |