Inspection History Details
Inspection Status: Approved
Inspection History: ELECTRIC - CABLE DROP
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/07/2006 | ELECTRIC - CABLE DROP | Approved | IVRS - Inspection :* | |
| 12/05/2006 | ELECTRIC - CABLE DROP | Not ready for Inspection | IVRS - Inspection :* MAKE SURE ALL CORRECTIONS ARE COMPLETE BEFORE YOU CALL IN AND HAVE ALL EQUIPMENT OPEN FOR INSPECTION CORRECTLY ADDRESS EQUIPMENT |
|
| 11/20/2006 | ELECTRIC - CABLE DROP | Denied | IVRS - Inspection : The service is not per code.| 210* IT APPEARS THE SERVICE TRENCH WAS NEVER INSPECTED. 1. BOND GUTTERS - NEC 250.92 (LINE SIDE GUTTERS). 2. IDENTIFY SERVICE DISCONNECTS - NEC 230.80 B AND INSTALL THE UNIT # LABEL. 3. ARRANGE BONDING CONDUCTORS TO PREVENT OBJECTIONABLE CURRENT -- NEC 250.6 4. DIFFERENT SIZED CONDUCTORS NOT ALLOWED UNDER SAME TERMINATION - NEC 110.3 (B), 110.14 5. HAVE UNDERSIZED EQUIPMENT BONDING JUMPERS - NEC 250.102 C 6. IN LOAD SIDE GUTTER - USE EQUIPMENT GROUND TO GROUND GUTTER AND INSTALL MISSING LOCKNUT - NEC 250.122 7. GROUND PULL BOX AND USE PROPER STRUT CLAMP - NEC 110 8. BOND ALL METAL PIPES TO SERVICE -- NEC 250.104 9. BOND BUILDING STEEL -- NEC 250.104 10. HAVE OVERFUSED FEEDERS - NEC 310 11. TIGHTEN ALL CONNECTIONS. 12. CAN'T READ CONDUCTOR MARKING. |