Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - ROUGH, SOIL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/21/2006 | PLUMBING - ROUGH, SOIL | Approved | IVRS - Inspection :* BEFORE BACKFILLING. REMOVE LARGE CHUNKS FROM SIDE OF DITCH THAT MAY FALL ONTO PIPE CAUSING DAMAGE. READ SEC. 315.4 OF THE ARIZONA STATE PLUMBING CODE AND COMPLY WITH THE REQUIREMENTS. CONTRACTOR IS RESPONSIBLE TO COMPLY WITH ALL CODES. |
|
| 04/19/2006 | PLUMBING - ROUGH, SOIL | Denied | IVRS - Inspection : See detailed listing on site.| 999* NO WATER IN ROUGH PIPING, REMOVE LARGE CHUNKS FROM PIPING AND FROM SIDE OF TRENCH TO PREVENT DAMAGE. PROVIDE CLEAN SHADING. |