Inspection History Details
Permit: T06CM01196
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/01/2006 | PLUMBING - FINAL | Approved | IVRS - Inspection :* | |
| 08/31/2006 | PLUMBING - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* - EXPOSE CLEAN OUT AT HS BREAK RM. - PERM CAP ALL ELIMINATED VENTS THAT STILL PENETRATE ROOF. - AAV AT VENT NEAR WH NOT PER PLAN - VTR - AAV AT FLORAL NOT PER PLAN - AAV AT DELI NOT PER PLAN, ABS BROKEN AT TEST TEE - THESE AAV'S WERE JAMMED UP TO CEILING AND CONCEALED BY INSULATION IN AN EFFORT TO HIDE THERE USE. - CHECK VENT ON SOUTH WALL OF DELI - ISOLATE CU TOUCHING METAL STUD - SUPPORT 8" VTR FROM STARBUCKS - QUESTION PEX PIPING IN CAT WALK - SCOPE OF WORK OR EXISTING. |
|
| 08/30/2006 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* VENT THRU ROOF NEEDED AT PRODUCE CASE VENTS AT TOILET RMS OK TRIM VENTS FOR FLASHINGS BACKFLOW CERTS RECEIVED CLEAN OUTS OK |
|
| 08/29/2006 | PLUMBING - FINAL | Partial Approval | IVRS - Inspection :* - BACKFLOW PROTECTION IN DELI INSTALLED STILL NEED CERTS - SEE NOTES FROM 5/25 REGARDING PUBLIC USE LAVITORIES. - COMPLY W/SEC 414.1 2003 UPC - CALL FOR INTERMEDIATE, AND ABOVE CEILING INSPECTIONS FOR VENT TERMINATIONS, PIPING SUPPORT & CLEANOUT INSPECTIONS. |
|
| 08/25/2006 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* DELI AREA -- ONE BACKFLOW DEVICE PER EQUIPMENT. - PROVIDE CERTS. SUPPORT BACKFLOW DEVICES - LOCATE AND TERMINATE ALL PLUMBING VENTS IF NOT YET THROUG ROOF CHECK RESTROOMS AND REFRIGERATED CASES. - LOCATE CLEANOUT FOR ALL SINKS. - ALL CLEANOUT PLUGS AND TEST TEE PLUGS SHALL BE MADE WATER & GAS TIGHT. - SUPPORT WATER PIPNG AT WH INSTALL EXP. TANK TERMINAATE T&P - SEWER MOP SINK BRACKET |
|
| 08/24/2006 | PLUMBING - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* EQUIPMENT CONNECTED TO POTABLE WATER PIPING SHALL BE LISTED BY AN APPROVED TESTING AGENCY OR SHALL HAVE A BACKFLOW PREVENTION DEVICE INSTALLED. DON'T LINK WATER FLEXES TOGETHER - USE CORRECT LENGTH. SUPPORT WATER PIPING. SUPPORT DRAIN PIPING. LOCATE CLEAN OUTS ON SINKS. CLEAN OUT PLUGS SHALL BE LISTED TO RECEIVE SCREW FROM COVER. |
|
| 08/23/2006 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* IN DELI PROVIDE CORRECT DRAINAGE FITTING FOR EQUIPMENT (LONG RADIUS) PROVIDE CORRECT BACKFLOW PROTECTION FOR WATER SYSTEMS WHERE REQUIRED. PROVIDE CLEANOUT PLUGS WITH MACHINE TAPS AND SCREWS & COVERS -- NOT READY |
|
| 06/16/2006 | PLUMBING - FINAL | Partial Approval | IVRS - Inspection :* - 3" WASTE FROM MOP SINK REQUIRES A 3" CLEANOUT. F C/O OK. - INSTALL 3" CLEANOUT. - 2' WASTE FOR F5 REQUIRES 2" CLEANOUT - MAY BE INSTALLED ON VENT. - OVERHEAD VENTS EMPLOYEE TRS WATER TEST OK - PROVIDE HANGERS AT EACH BRANCH CONNECTION, ELEVATION CHANGE AND EVERY 4'. - PLUMBERS TAPE NOT ALLOWED. - SUPPORT COPPER BRANCHES. |
|
| 06/15/2006 | PLUMBING - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* AT LOUNGE TOILET RM YOU HAVE OPEN VENTS ABOVE WCS COMPLETE VENTING ABOVE CEILING PROPERLY SUPPORT WITH PIPE HANGERS AND WATER TEST. LOCATE CLEAN OUT AT URINAL. SUPPORT TRAP PRIMER LINES AND OPEN VALVES. REMOVE EXCESS FLUX FROM COPPER JOINTS ABOVE CEILING. AT FLOOR DRAIN AND FS AT MOP SINK AREA. PROVIDE WATER TEST TO 10' OK TO COVER 4" MAIN. CORRECT BRANCH LINES, VENTS AND RETEST. |