Date Description Inspector Results Comments
09/01/2006 PLUMBING - FINAL Approved IVRS - Inspection :*
08/31/2006 PLUMBING - FINAL Denied IVRS - Inspection :
See detailed listing on site.| 999*
- EXPOSE CLEAN OUT AT HS BREAK RM.
- PERM CAP ALL ELIMINATED VENTS THAT STILL PENETRATE ROOF.
- AAV AT VENT NEAR WH NOT PER PLAN - VTR
- AAV AT FLORAL NOT PER PLAN
- AAV AT DELI NOT PER PLAN, ABS BROKEN AT TEST TEE
- THESE AAV'S WERE JAMMED UP TO CEILING AND CONCEALED BY INSULATION IN AN EFFORT TO HIDE THERE USE.
- CHECK VENT ON SOUTH WALL OF DELI
- ISOLATE CU TOUCHING METAL STUD
- SUPPORT 8" VTR FROM STARBUCKS
- QUESTION PEX PIPING IN CAT WALK - SCOPE OF WORK OR EXISTING.
08/30/2006 PLUMBING - FINAL Not ready for Inspection IVRS - Inspection :*
VENT THRU ROOF NEEDED AT PRODUCE CASE
VENTS AT TOILET RMS OK
TRIM VENTS FOR FLASHINGS
BACKFLOW CERTS RECEIVED
CLEAN OUTS OK
08/29/2006 PLUMBING - FINAL Partial Approval IVRS - Inspection :*
- BACKFLOW PROTECTION IN DELI INSTALLED STILL NEED CERTS
- SEE NOTES FROM 5/25 REGARDING PUBLIC USE LAVITORIES.
- COMPLY W/SEC 414.1 2003 UPC
- CALL FOR INTERMEDIATE, AND ABOVE CEILING INSPECTIONS
FOR VENT TERMINATIONS, PIPING SUPPORT & CLEANOUT INSPECTIONS.
08/25/2006 PLUMBING - FINAL Not ready for Inspection IVRS - Inspection :*
DELI AREA -- ONE BACKFLOW DEVICE PER EQUIPMENT.
- PROVIDE CERTS. SUPPORT BACKFLOW DEVICES
- LOCATE AND TERMINATE ALL PLUMBING VENTS IF NOT YET THROUG ROOF CHECK RESTROOMS AND REFRIGERATED CASES.
- LOCATE CLEANOUT FOR ALL SINKS.
- ALL CLEANOUT PLUGS AND TEST TEE PLUGS SHALL BE MADE WATER & GAS TIGHT.
- SUPPORT WATER PIPNG AT WH INSTALL EXP. TANK TERMINAATE T&P
- SEWER MOP SINK BRACKET
08/24/2006 PLUMBING - FINAL Denied IVRS - Inspection :
See detailed listing on site.| 999*
EQUIPMENT CONNECTED TO POTABLE WATER PIPING SHALL BE LISTED BY AN APPROVED TESTING AGENCY OR SHALL HAVE A BACKFLOW PREVENTION DEVICE INSTALLED. DON'T LINK WATER FLEXES TOGETHER - USE CORRECT LENGTH.
SUPPORT WATER PIPING. SUPPORT DRAIN PIPING. LOCATE CLEAN OUTS ON SINKS. CLEAN OUT PLUGS SHALL BE LISTED TO RECEIVE SCREW FROM COVER.
08/23/2006 PLUMBING - FINAL Not ready for Inspection IVRS - Inspection :*
IN DELI PROVIDE CORRECT DRAINAGE FITTING FOR EQUIPMENT (LONG RADIUS) PROVIDE CORRECT BACKFLOW PROTECTION FOR WATER SYSTEMS WHERE REQUIRED. PROVIDE CLEANOUT PLUGS WITH MACHINE TAPS AND SCREWS & COVERS -- NOT READY
06/16/2006 PLUMBING - FINAL Partial Approval IVRS - Inspection :*
- 3" WASTE FROM MOP SINK REQUIRES A 3" CLEANOUT.
F C/O OK.
- INSTALL 3" CLEANOUT.
- 2' WASTE FOR F5 REQUIRES 2" CLEANOUT - MAY BE INSTALLED ON VENT.
- OVERHEAD VENTS EMPLOYEE TRS WATER TEST OK -
PROVIDE HANGERS AT EACH BRANCH CONNECTION, ELEVATION CHANGE AND EVERY 4'.
- PLUMBERS TAPE NOT ALLOWED.
- SUPPORT COPPER BRANCHES.
06/15/2006 PLUMBING - FINAL Denied IVRS - Inspection :
See detailed listing on site.| 999*
AT LOUNGE TOILET RM YOU HAVE OPEN VENTS ABOVE WCS
COMPLETE VENTING ABOVE CEILING
PROPERLY SUPPORT WITH PIPE HANGERS AND WATER TEST.
LOCATE CLEAN OUT AT URINAL.
SUPPORT TRAP PRIMER LINES AND OPEN VALVES.
REMOVE EXCESS FLUX FROM COPPER JOINTS ABOVE CEILING.
AT FLOOR DRAIN AND FS AT MOP SINK AREA.
PROVIDE WATER TEST TO 10'
OK TO COVER 4" MAIN.
CORRECT BRANCH LINES, VENTS AND RETEST.