Permit: T06CM01196

Inspection Status: Approved

Inspection History: PLUMBING - SEWER HCS CONNECT

Date Description Inspector Results Comments
08/25/2006 PLUMBING - SEWER HCS CONNECT Approved IVRS - Inspection :*
05/31/2006 PLUMBING - SEWER HCS CONNECT Partial Approval IVRS - Inspection :*
4" BUILDING SEWER CONNECTION AT WEST END FOR FLORAL & RESTROOMS OK WATER TESTED.
05/25/2006 PLUMBING - SEWER HCS CONNECT Partial Approval IVRS - Inspection :*
CONTRACTOR REQUEST HOLD OVER FOR AFTER HOURS GREASE INTERCEPTOR INSTALL PER REDLINE ON SITE WATER TEST INCLUDING 3" VENT AND 4" GREASE LINE BACK TO BUILDING FOOTING -- DOWNSTREAM TIE INTO 6" OK
1. COMBINATION WASTE & VENT TO BE INSTALLED WITH VENT PER PLAN, BRANCH TAKE OFFS TO BE HORIZONTAL,
(1) OFFSET ONLY IF REQUIRED TO MAINTAIN 24" MAX. TAILPIECE.
FLORAL SINK AND COMPENSATE FLOOR SINK
UNDERGROUND OK
2. FLOOR SINK FOR ROSE CASE TO BE VENTED PER PLAN
RESTROOM LAVS & BREAKROOM SINK UNDERGROUND OK
3. LONG RADIUS DRAINAGE FITTINGS REQUIRED FOR STOOL ON BACK TO BACK.
4. REPAIR LEAK AT 4" BUILDING SEWER ON WEST END 15' FROM TIE INTO EXISTING 6", PROVIDE UNALTERED WYE FITTING FOR CONNECTION INTO 6" & RETEST.
05/25/2006 PLUMBING - SEWER HCS CONNECT Denied IVRS - Inspection :
See detailed listing on site.| 999*
4" SANITARY SEWER AT WEST END
PROVIDE CORRECT TRANSITION FOR ABS TO PVC ABS GLUE IS NOT. IN FUTURE PROVIDE SOLVENT WELD COUPLINGS ON ALL NEW INSTALL OF ABS PIPING. NOTE TEST FITTING SHALL BE INSTALLED IN DIRECTION OF FLOW.