Permit: T06CM01196

Inspection Status: Approved

Inspection History: PLUMBING - INTERMEDIATE

Date Description Inspector Results Comments
08/31/2006 PLUMBING - INTERMEDIATE Approved IVRS - Inspection :*
08/25/2006 PLUMBING - INTERMEDIATE Partial Approval IVRS - Inspection :*
08/15/2006 PLUMBING - INTERMEDIATE Partial Approval IVRS - Inspection :*
CHECK #25267
DELI WATER PIPING IN EAST AND SOUTH WALL ON TEST OK
08/02/2006 PLUMBING - INTERMEDIATE Partial Approval IVRS - Inspection :*
ADD WALL AND FLOOR CLEANOUTS FOR FLOOR SINKS AT ALL FLOOR SINKS
07/28/2006 PLUMBING - INTERMEDIATE Partial Approval IVRS - Inspection :*
AFTER HOURS INSP. MONEY ORDER #5558428580
1. BAKERY ABOVE CEILING OK PER REDLINE DRAWING. REDLINE DRAWING TO APPROVED DRAWING.
2. BACKFLOW CERTIFIED OK FOR SODA FOUNTAIN IN FRONT OF STORE.
07/25/2006 PLUMBING - INTERMEDIATE Partial Approval IVRS - Inspection :*
BAKERY WATER REDLINE ON PIPE SIZE OK
07/17/2006 PLUMBING - INTERMEDIATE Partial Approval IVRS - Inspection :*
NORTH & EAST WALL MIDSPAN SUPPORTS OK
07/14/2006 PLUMBING - INTERMEDIATE Partial Approval IVRS - Inspection :*
AFTER HOURS INSPECTION CHECK #5533726386
WATER PIPING IN WALL FOR CHILLER, SIDE X SIDE LAVS, PAN WASHER, R.O UNIT NORTH IN WALL ONLY OF BAKERY AREA, EAST WALL BAKERY WATER PIPING 3-COMP SINK IN WALL ONLY.
1. PROVIDE MID-SPAN SUPPORTS ALL PIPING BEFORE SHEETROCK.
2. INSTALL ALL OVERHEAD PIPING WITH VALVING, CORRECT SUPPORT, AND PER YOUR APPROVED PLAN PER SIZING & LAYOUT REQUIREMENTS.
07/12/2006 PLUMBING - INTERMEDIATE Partial Approval IVRS - Inspection :*
AFTER HRS. INSP. CHECK #5533726364
WATER TEST VENT FROM FLOOR SINK & TRENCH DRAIN AT CHILLED WATER AREA THRU ROOF OK
3-COMP SINK DRAINAGE & VENT THRU ROOF ALL IN BAKERY OK
1. WATER PIPING IN WALL REQUIRES TEST BEFORE COVERING
WASTE & VENT THRU ROOF BAKERY ALL OK WATER TEST
2. NEED OVERHEAD SUPPORTS (ONLY) FOR WASTE & VENT IN BAKERY.
07/11/2006 PLUMBING - INTERMEDIATE Partial Approval IVRS - Inspection :*
AFTER HOURS INSPECTION CHECK #5533726337
1. 2" FLOOR SINK UNDERGROUND THRU ROOF FOR BAKERY OVEN OK
2. 2" FLOOR SINK FOR CAKE DECORATION OK
3. 2" VENT THRU ROOF FOR BAKERY 3-COMP SINK FLOOR SINK
(2) TRENCH DRAINS OK.
4. NEED TO ADD SANTEE FOR DIRECT CONNECTION OF 3-COMP SINK. 1 1/2 VENT THRU ROOF FOR HAND SINK OK
NORTH WALL OK
06/30/2006 PLUMBING - INTERMEDIATE Partial Approval IVRS - Inspection :*
1) 2" VENTS THRU ROOF WATER TEST FOR PRODUCE PREP OK
2) PROVIDE ADDITIONAL SUPPORTS FOR OVER HEAD VENTS AND PROVIDE CLEANOUTS REQUIRED ON SINKS THIS AREA PARTIAL APPROVAL
06/14/2006 PLUMBING - INTERMEDIATE Not ready for Inspection IVRS - Inspection :*
06/07/2006 PLUMBING - INTERMEDIATE Not ready for Inspection IVRS - Inspection :*
05/31/2006 PLUMBING - INTERMEDIATE Partial Approval IVRS - Inspection :*
RESTROOM AREA OK TO ABOVE TOP PLATE FOR VENTS WATER PIPING IN WALL & OVERHEAD PARTIAL APPROVAL
05/25/2006 PLUMBING - INTERMEDIATE Not ready for Inspection IVRS - Inspection :*
THERE SHALL BE NO UNCAPPED OPEN DRAINS OR VENTS IN THIS STORE. FINISH UP AT STARBUCKS ITEMS WE DISCUSSED.
05/15/2006 PLUMBING - INTERMEDIATE Partial Approval IVRS - Inspection :*
SEE NOTE #5 FROM 5/11/06
YOUR 3" VENT FOR STARBUCKS SHALL BE TERMINATED THRU ROOF WITH TEST THRU ROOF.
NOTE: REMEMBER WE TALKED ABOUT VENTS BEING CAPPED OFF INSIDE THE BUILDING STRUCTURE. WHEN TIED INTO DRAINAGE SYSTEM. SUPPORT THIS VENT CORRECTLY ON VERTICAL FOR ABS PLASTIC PIPING.
RECEIVED (4) BACKFLOW CERTIFICATIONS FOR STARBUCKS AND OK FOR PEX ON BUILDING INTERIOR.
NEED TO VIEW CORRECT SUPPORT OF WATER PIPING OVERHEAD TO STARBUCKS & DOWN COLUMN.
STARBUCKS IS OK
05/11/2006 PLUMBING - INTERMEDIATE Not ready for Inspection IVRS - Inspection :*
1. PROVIDE MINIMUM 3/4" DRAIN FOR ESPRESSO MACHINES.
2. PROVIDE COPPER PIPING PER PLAN OR STAMPED LETTER FROM ENGINEER FOR OK OF PEX PIPIG.
3. SECURE WATER PIPING AT CORRECT INTERVALS FOR MATERIAL TYPES.
4. PROVIDE CERTIFICATIONS FOR BACKFLOW DEVICES.
5. COMPLETE VENT THRU ROOF WITH TEST.
6. PROVIDE SEPARATE DRAIN FOR SANITIZE BOWL ON 3-COMP SINK.
7. SUPPORT PIPING ON VERTICAL AND HORIZONTAL AT CORRECT INTERVALS (WATER SUPPLY TO STARBUCKS).
8. HAVE ALL FIXTURES & APPLIANCES INSTALLED AND FUNCTIONAL FOR FINAL.