Inspection History Details
Permit: T06CM01196
Inspection Status: Approved
Inspection History: PLUMBING - INTERMEDIATE
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/31/2006 | PLUMBING - INTERMEDIATE | Approved | IVRS - Inspection :* | |
| 08/25/2006 | PLUMBING - INTERMEDIATE | Partial Approval | IVRS - Inspection :* | |
| 08/15/2006 | PLUMBING - INTERMEDIATE | Partial Approval | IVRS - Inspection :* CHECK #25267 DELI WATER PIPING IN EAST AND SOUTH WALL ON TEST OK |
|
| 08/02/2006 | PLUMBING - INTERMEDIATE | Partial Approval | IVRS - Inspection :* ADD WALL AND FLOOR CLEANOUTS FOR FLOOR SINKS AT ALL FLOOR SINKS |
|
| 07/28/2006 | PLUMBING - INTERMEDIATE | Partial Approval | IVRS - Inspection :* AFTER HOURS INSP. MONEY ORDER #5558428580 1. BAKERY ABOVE CEILING OK PER REDLINE DRAWING. REDLINE DRAWING TO APPROVED DRAWING. 2. BACKFLOW CERTIFIED OK FOR SODA FOUNTAIN IN FRONT OF STORE. |
|
| 07/25/2006 | PLUMBING - INTERMEDIATE | Partial Approval | IVRS - Inspection :* BAKERY WATER REDLINE ON PIPE SIZE OK |
|
| 07/17/2006 | PLUMBING - INTERMEDIATE | Partial Approval | IVRS - Inspection :* NORTH & EAST WALL MIDSPAN SUPPORTS OK |
|
| 07/14/2006 | PLUMBING - INTERMEDIATE | Partial Approval | IVRS - Inspection :* AFTER HOURS INSPECTION CHECK #5533726386 WATER PIPING IN WALL FOR CHILLER, SIDE X SIDE LAVS, PAN WASHER, R.O UNIT NORTH IN WALL ONLY OF BAKERY AREA, EAST WALL BAKERY WATER PIPING 3-COMP SINK IN WALL ONLY. 1. PROVIDE MID-SPAN SUPPORTS ALL PIPING BEFORE SHEETROCK. 2. INSTALL ALL OVERHEAD PIPING WITH VALVING, CORRECT SUPPORT, AND PER YOUR APPROVED PLAN PER SIZING & LAYOUT REQUIREMENTS. |
|
| 07/12/2006 | PLUMBING - INTERMEDIATE | Partial Approval | IVRS - Inspection :* AFTER HRS. INSP. CHECK #5533726364 WATER TEST VENT FROM FLOOR SINK & TRENCH DRAIN AT CHILLED WATER AREA THRU ROOF OK 3-COMP SINK DRAINAGE & VENT THRU ROOF ALL IN BAKERY OK 1. WATER PIPING IN WALL REQUIRES TEST BEFORE COVERING WASTE & VENT THRU ROOF BAKERY ALL OK WATER TEST 2. NEED OVERHEAD SUPPORTS (ONLY) FOR WASTE & VENT IN BAKERY. |
|
| 07/11/2006 | PLUMBING - INTERMEDIATE | Partial Approval | IVRS - Inspection :* AFTER HOURS INSPECTION CHECK #5533726337 1. 2" FLOOR SINK UNDERGROUND THRU ROOF FOR BAKERY OVEN OK 2. 2" FLOOR SINK FOR CAKE DECORATION OK 3. 2" VENT THRU ROOF FOR BAKERY 3-COMP SINK FLOOR SINK (2) TRENCH DRAINS OK. 4. NEED TO ADD SANTEE FOR DIRECT CONNECTION OF 3-COMP SINK. 1 1/2 VENT THRU ROOF FOR HAND SINK OK NORTH WALL OK |
|
| 06/30/2006 | PLUMBING - INTERMEDIATE | Partial Approval | IVRS - Inspection :* 1) 2" VENTS THRU ROOF WATER TEST FOR PRODUCE PREP OK 2) PROVIDE ADDITIONAL SUPPORTS FOR OVER HEAD VENTS AND PROVIDE CLEANOUTS REQUIRED ON SINKS THIS AREA PARTIAL APPROVAL |
|
| 06/14/2006 | PLUMBING - INTERMEDIATE | Not ready for Inspection | IVRS - Inspection :* | |
| 06/07/2006 | PLUMBING - INTERMEDIATE | Not ready for Inspection | IVRS - Inspection :* | |
| 05/31/2006 | PLUMBING - INTERMEDIATE | Partial Approval | IVRS - Inspection :* RESTROOM AREA OK TO ABOVE TOP PLATE FOR VENTS WATER PIPING IN WALL & OVERHEAD PARTIAL APPROVAL |
|
| 05/25/2006 | PLUMBING - INTERMEDIATE | Not ready for Inspection | IVRS - Inspection :* THERE SHALL BE NO UNCAPPED OPEN DRAINS OR VENTS IN THIS STORE. FINISH UP AT STARBUCKS ITEMS WE DISCUSSED. |
|
| 05/15/2006 | PLUMBING - INTERMEDIATE | Partial Approval | IVRS - Inspection :* SEE NOTE #5 FROM 5/11/06 YOUR 3" VENT FOR STARBUCKS SHALL BE TERMINATED THRU ROOF WITH TEST THRU ROOF. NOTE: REMEMBER WE TALKED ABOUT VENTS BEING CAPPED OFF INSIDE THE BUILDING STRUCTURE. WHEN TIED INTO DRAINAGE SYSTEM. SUPPORT THIS VENT CORRECTLY ON VERTICAL FOR ABS PLASTIC PIPING. RECEIVED (4) BACKFLOW CERTIFICATIONS FOR STARBUCKS AND OK FOR PEX ON BUILDING INTERIOR. NEED TO VIEW CORRECT SUPPORT OF WATER PIPING OVERHEAD TO STARBUCKS & DOWN COLUMN. STARBUCKS IS OK |
|
| 05/11/2006 | PLUMBING - INTERMEDIATE | Not ready for Inspection | IVRS - Inspection :* 1. PROVIDE MINIMUM 3/4" DRAIN FOR ESPRESSO MACHINES. 2. PROVIDE COPPER PIPING PER PLAN OR STAMPED LETTER FROM ENGINEER FOR OK OF PEX PIPIG. 3. SECURE WATER PIPING AT CORRECT INTERVALS FOR MATERIAL TYPES. 4. PROVIDE CERTIFICATIONS FOR BACKFLOW DEVICES. 5. COMPLETE VENT THRU ROOF WITH TEST. 6. PROVIDE SEPARATE DRAIN FOR SANITIZE BOWL ON 3-COMP SINK. 7. SUPPORT PIPING ON VERTICAL AND HORIZONTAL AT CORRECT INTERVALS (WATER SUPPLY TO STARBUCKS). 8. HAVE ALL FIXTURES & APPLIANCES INSTALLED AND FUNCTIONAL FOR FINAL. |