Permit: T06CM01196

Inspection Status: Approved

Inspection History: ELECTRIC - FINAL

Date Description Inspector Results Comments
11/08/2007 ELECTRIC - FINAL Approved IVRS - Inspection :*
09/12/2007 ELECTRIC - FINAL Denied IVRS - Inspection :
See detailed listing on site.| 999*
NEED PLAN CHECK CITY APPROVAL STAMP
06/28/2007 ELECTRIC - FINAL Not ready for Inspection IVRS - Inspection :*
NEED CITY APPROVED STAMP -- STANTEC DID THIRD PARTY
09/13/2006 ELECTRIC - FINAL Not ready for Inspection IVRS - Inspection :*
08/31/2006 ELECTRIC - FINAL Partial Approval IVRS - Inspection :*
08/28/2006 ELECTRIC - FINAL Not ready for Inspection IVRS - Inspection :*
CANCELLED BY TOM
08/25/2006 ELECTRIC - FINAL Partial Approval IVRS - Inspection :*
FINISH UPSTAIRS SERVICE
FINISH LB FITTING DELI
WAITING ON BACK ORDER PARTS
OK PANEL "CL"
08/23/2006 ELECTRIC - FINAL Partial Approval IVRS - Inspection :*
OK DELI SUBJECT TO OTHERS
1. FINISH PREVIOUS INSPECTIONS

RECEIVED MONEY ORDER #55584289057 $108.00
08/23/2006 ELECTRIC - FINAL Not ready for Inspection IVRS - Inspection :*
CANCELLED BY TODD
08/21/2006 ELECTRIC - FINAL Partial Approval REC'D CHECK #25436 $163.00
1. FINISH VDV BEER & WINE, ISLE, CASHIER, SERVICE HALL
2. FINISH ELECTRIC NEXT TO PANEL BA AT CEILING
3. USE APPROVED FITTING WITH LB
4. FINISH SEALING 300.7 REFRIGERATOR, DELI
5. KITCHEN RECEPTACLES FOR GENERAL USE TO BE GFCI 210.8
6. OLD PANEL CL TO HAVE NEW JUNCTION BOX COVER
7. SUPPORT BATH EXHAUST FAN JUNCTION BOX
8. FINISH ROOF BUSHINGS AS DISCUSSED.
08/21/2006 ELECTRIC - FINAL Not ready for Inspection IVRS - Inspection :*
CANCELLED BY TOM
08/17/2006 ELECTRIC - FINAL Partial Approval IVRS - Inspection :*
1. CANNOT ACCESS PANEL -- MAINTAIN WORKING CLEARANCE
2. MAINTAIN SURFACE CONTACT (T-2) FOR GROUND LUG
3. VERIFY TAP RULES 240.21
4. MISSING JUNCTION BOX COVERS

OK ROOF DISCONNECTS A/C
08/16/2006 ELECTRIC - FINAL Not ready for Inspection IVRS - Inspection :*
CANCELLED BY TOM
08/15/2006 ELECTRIC - FINAL Not ready for Inspection IVRS - Inspection :*
08/10/2006 ELECTRIC - FINAL Not ready for Inspection IVRS - Inspection :*
CANCELLED BY TOM
08/09/2006 ELECTRIC - FINAL Partial Approval IVRS - Inspection :*
1. FINISH DEMO
2. FINISH ABOVE CEILING DELI
08/08/2006 ELECTRIC - FINAL Not ready for Inspection IVRS - Inspection :*
1. RECEPTACLE COVERS BELOW SINKS IN WET LOCATION NEED TO BE FOR WET LOCATION.
2. RE-SUPPORT M/C & CAN ABOVE CEILING AT DELI

OK DELI TEMP OCCUPANCY

RECEIVED CHECK #25270 FOR $108.00
08/07/2006 ELECTRIC - FINAL Partial Approval IVRS - Inspection :*
1. FINISH VDV ABOVE SERVICE HALL
2. FINISH NEXT TO PANEL "BA" AT CEILING
3. SUPPORT VDV ABOVE WATER & BEER AISLES
08/06/2006 ELECTRIC - FINAL Not ready for Inspection IVRS - Inspection :*
2036
2090
OK NORTH (HOOD) DELI WALL

RECEIVED CHECK #25272 FOR $108.00
08/04/2006 ELECTRIC - FINAL Partial Approval IVRS - Inspection :*
08/03/2006 ELECTRIC - FINAL Not ready for Inspection IVRS - Inspection :*
OK CASHIER STANDS
OK 3 - 3/4" & 1 - 1" PVC UNDER DELI
OK WINDOW DELI
OK BAKERY SUBJECT TO OTHER INSPECTIONS

1. SAFEWAY PERSONNEL NOT TO BE OPERATING IN CONSTRUCTION AREA.
2. SUPPORT VDV CABELING ABOVE CASHIERS

RECEIVED CHECK 25273 FOR $108.00
08/02/2006 ELECTRIC - FINAL Partial Approval IVRS - Inspection :*
08/01/2006 ELECTRIC - FINAL Partial Approval IVRS - Inspection :*
1. MAINTAIN WORKING CLEARANCE IN FRONT OF CONTROL PANEL.
2. FINISH VDV CABELING
3. MAINTAIN WORKING CLEARANCE WATER CHILLER
4. FILLER BLANKS IN PANELS
5. SUPPORT ANSUL CONDUIT ABOVE GRID AND ON WALL
6. FINISH SUPPORTS TO CORD DROPS.

RECEIVED MONEY ORDER #55584286434 FOR $108.00
06/23/2006 ELECTRIC - FINAL Partial Approval IVRS - Inspection :*
06/22/2006 ELECTRIC - FINAL Denied IVRS - Inspection :
The wiring is not complete or does not comply with code.| 245*
06/21/2006 ELECTRIC - FINAL Denied IVRS - Inspection :
The wiring is not complete or does not comply with code.| 245*
06/16/2006 ELECTRIC - FINAL Denied IVRS - Inspection :
See detailed listing on site.| 999*
1. CIRCUIT DIRECTORY STILL NOT LABELED - ALSO PANEL ON OUTSIDE OF COVER.
2. WHERE IS MAIN BONDING JUMPER SECONDARY SIDE OF TRANSFORMER?
3. MANUFACTURERS LABELING REQUIRE ALL FIELD WIRING BELOW ARROWS.
4. PLEASE DE-ENERGIZE UNTIL CORRECTIONS ARE MADE.
06/15/2006 ELECTRIC - FINAL Not ready for Inspection IVRS - Inspection :*
OK TO TILE RESTROOM CORRIDOR & BREAKROOM
1. FIXTURES TO BE SECURELY ATTACHED TO GRID 410.16
IF SCREWS 4 ON CORNERS OR 2 ON CENTERS.
2. ONLY ONE CONDUCTOR PER TERMINATION AT LUGS.
3. PROTECT CONDUCTORS #4 & LARGER AT FITTINGS.
4. GROUNDING FOR TRANSFORMER TO BE ATTACHED TO CASE NOT SUPPORT FOOT.
5. LABEL CIRCUIT BREAKER.
6. CLEAN EXCESS FOREIGN MATERIAL OUT OF PANEL.
06/14/2006 ELECTRIC - FINAL Partial Approval IVRS - Inspection :*
05/11/2006 ELECTRIC - FINAL Partial Approval IVRS - Inspection :*