Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/13/2008 | PLUMBING - FINAL | Approved | IVRS - Inspection :* | |
| 06/28/2007 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* - BREAK OFF LOCKING SCREW ON HB VAC BREAKER - PROVIDE BACKFLOW CERTS FOR INTERNAL BACKFLOW ASSEMBLIES - PROVIDE LETTER FROM SMU ALLOWING 1. PVC WITHIN WELL BUILDING AND 2. INTERMIXING OF GALV AND COPPER INSIDE WELL BUILDING |
|
| 05/17/2007 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* 3" PVC SCH 40 FROM PUMP HOUSE SOUTHWEST CORNER RUNS WEST TO 2 1/2 X 2 1/2 X 3 TEE THIS SECTION TO BE PROPERLY BEDDED & SHADED, 2 1/2 CONTINUES WEST APP. 80' THEN SOUTH APP. 100' THIS SECTION OK, 2 1/2 STUB UPS (3) TURNS WEST 2" STUB FOR EXISTING BLD. 5 CONTINUES WEST 200' TO STUB UP FOR BLD. Y WATER TEST OK |