Inspection History Details
Inspection Status: Approved
Inspection History: ENGINEERING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/27/2006 | ENGINEERING - FINAL | Approved | From: Craig Gross To: Nichole Kalahar 09/26/2006 2:29 PM T06CM00991 - 5028 E. 22nd street Nichole - being as this is a TI and continues to be a problem (and I'm not sure why you got stuck being involved anyhow), I would like you to either approve or pass the engineering inspection and let LeeRay handle the final site issue. Please make the change today or early tomorrow so LeeRay can do his final inspection and get the C of O issued for the Massage Therapist. Thanks. Craig |
|
| 08/30/2006 | ENGINEERING - FINAL | Denied | RE FEE SITE PLAN DOES NOT MATCH SITE RE-DRAW AND SUBMIT TO CITY OF TUCSON-MUST BE STAMPED AS APPROVED SITE PLAN SEE SITE PLAN AT SITE-NOTATIONS MADE AND DISCUSSED WITH CONTRACTOR ON SITE |
|
| 08/04/2006 | ENGINEERING - FINAL | Denied | RE-FEE -SITE PLAN DOES NOT MATCH SITE MISSING 5 PARKING SPACES ON WEST SIDE OF SITE -H/C PARKING HAS BEEN MOVED (RE DRAW SITE PLAN AND HAVE REVISION REVIEWED BY COT) -WOOD RAMP (H/C ACCESS ?) NEEDS TO BE REMOVED AT STORE FRONT -H/C ACCESSIBLE ROUTE IN REAR NOT USABLE -CARPORT/AWNING STILL NOT SHOWN ON PLAN -PARKING SPACE GOES THROUGH EXISTING FENCE AND AWNING |
|
| 07/07/2006 | ENGINEERING - FINAL | Denied | 1. SITE PLAN DOES NOT MATCH SITE 47 PARKING SPACES CALLED FOR-21 STRIPED 2. DUMPSTER LOCATION NOT DRAWN ON SITE PLAN 3. COVERED CARPORT NORTH OF FENCE ON WEST SIDE OF SITE NOT SHOWN 4. HANDICAPPED PARKING NOT PROVIDED? SPOKE WITH DAVID RIVERA-MAY NEED TO BE REVIEWED ALL CHANGES MUST BE APPROVED BY C.O.T. |
|
| 04/17/2006 | ENGINEERING - FINAL | Not ready for Inspection | SITE NOT READY FOR INSPECTION MOVE IN/OPEN DATE IS SET FOR 1 JUNE |