Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - ROUGH, SOIL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/05/2006 | PLUMBING - ROUGH, SOIL | Approved | IVRS - Inspection :* | |
| 05/17/2006 | PLUMBING - ROUGH, SOIL | Partial Approval | IVRS - Inspection :* WATER TEST UNDERGROUND WASTE & VENT ONLY FOR RESTROOM 19&20 1. NEED TO SEE PIPE WRAPS PRIOR TO CONCRETE. 2. PROVIDE CORRECT BACKFLOW CERTIFICATION FOR EQUIPMENT BEING USED AT SOUTHEAST EXTERIOR OF YOUR SUITE. |
|
| 05/11/2006 | PLUMBING - ROUGH, SOIL | Denied | IVRS - Inspection : See detailed listing on site.| 999* STILL NOT SUITE ADDRESS. READ ALL NOTES AND COMPLY OR EXPECT TO PAY REFEE. NOTE: A DOUBLE SANTEE IS NOT CORRECT FITTING FOR BACK TO BACK STOOLS. |
|
| 05/04/2006 | PLUMBING - ROUGH, SOIL | Denied | IVRS - Inspection : See detailed listing on site.| 999* SEE NOTES ABOVE FROM 4/17/06 PROVIDE APPROVED FITTINGS AND METHODS FOR ALL PLUMBING SYSTEMS WITH TESTING IN PLACE AT TIME OF INSPECTION. HAVE YOUR PLUMBER ON SITE AT FUTURE INSPECTION. |
|
| 04/17/2006 | PLUMBING - ROUGH, SOIL | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1. POST SUITE ADDRESS. 2. EXPOSE ALL PLUMBING WORK, PROVIDE TESTING WITH INSPECTION. PROVIDE APPROVED PLAN OF ALL PLUMBING OR REMOVE IT. PROVIDE WORK SHOWN ON PLAN. |