Inspection History Details
Inspection Status: Approved
Inspection History: ENGINEERING - FINAL
Permit Number - T06CM00987
Inspection Description - ENGINEERING - FINAL
Inspection Status - Approved
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/06/2006 | ENGINEERING - FINAL | Approved | 2 INSPECTIONS PERFORMED AM INSPECTION HAD ITEM 2 FROM 6/28 INSPECTION OUTSTANDING-CONCRETE WAS POURED FOR AFTERNOON INSPECTION-AND WAS BEING FINISHED ITEM NUMBER 3 FROM 6/28 IS AN ISSUE TO BE ADDRESSED BY TL ROOF THERE IS OUTSTANDING SITE WORK TO BE COMPLETED UNDER T03BU03084. FRY'S GROCERY AND MOST ALL OTHER SHOPS/SHOPETTES ARE UNDER T C O UNTIL ALL SITE WORK COMPLETE |
|
| 06/28/2006 | ENGINEERING - FINAL | Denied | 1. REMOVE ALL ROLL OFF DUMPSTERS, CONSTRUCTION MATERIALS, STORAGE, ETC. 2. PLACE MATCHING CONCRETE P.A.A.L. ON SOUTH SIDE OF FUELING AREA TO HANDICAPPED ACCESSIBLE RAMP (KEYNOTE 17 C-1) 3. PONDING WATER AT NE CORNER OF SITE BY CURB I HAVE ALSO CONTACTED TL ROOF (TOMMY ROOF) TO ADVISE OF ITEMS 2 AND 3 AS THESE MAY BE TL ROOF'S RESPONSIBILITY. |
|
| 05/22/2006 | ENGINEERING - FINAL | Not ready for Inspection | AWNING GOING UP SITE WORK STILL OUTSTANDING |
|
| 04/26/2006 | ENGINEERING - FINAL | Not ready for Inspection | HAULING SHOULD CONTINUE THRU 4/27. SITE SUPER ADVISED HE WILL HAVE ALL SWEEPING OF SITE TAKEN CARE OF. |