Inspection Status: Approved
Inspection History: ENGINEERING - FINAL
| Date |
Description |
Inspector |
Results |
Comments |
| 09/05/2008 |
ENGINEERING - FINAL |
|
Approved |
Contractor provided revised drawing for inspection. |
| 04/21/2008 |
ENGINEERING - FINAL |
|
Continued |
OK TO POUR DRIVEWAY AND SIDEWALKS |
| 04/18/2008 |
ENGINEERING - FINAL |
|
Continued |
Appoved to pour half of driveway approach and curb on-site. |
| 04/17/2008 |
ENGINEERING - FINAL |
|
Not ready for Inspection |
COMPLETE ALL WORK |
| 04/09/2008 |
ENGINEERING - FINAL |
|
Partial Approval |
CHECKED ON-SITE SIDEWALK FORMS |
| 01/08/2008 |
ENGINEERING - FINAL |
|
Not ready for Inspection |
REVIEWED SITE PLAN AND PRECON DISCUSSIONS WITH LARRY LIASCOS OF LOCAL DESIGN 551-9874 |