Inspection History Details
Inspection Status: Not ready for Inspection
Inspection History: PLUMBING - GAS PRESS TEST FNL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/09/2006 | PLUMBING - GAS PRESS TEST FNL | Not ready for Inspection | IVRS - Inspection :* | |
| 03/13/2006 | PLUMBING - GAS PRESS TEST FNL | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1. PROVIDE MINIMUM TEST PRESSURE PER YOUR APPROVED PLAN. 2. GAS VALVE TO BE AGA OR CSA APPROVED 3. PROVIDE FLASHING THERE AT PENETRATION THRU ROOF 4. METALLIC PIPING UNDERGROUND TO BE PRIMED THEN TAPE 5. PIPING SHALL BE TESTED IN ITS ENTIRETY AND APPLIANCE IS TO BE AVAILABLE FOR INSPECTION OF LISTING PLATE HAVE PIPING CORRETLY INSTALLED TO TANK AND APPLIANCE SHUT OFF WITHIN 3' OF APPLIANCE. 6. BUILDING GAS PIPING TO BE BONDED. 7. INSTALL TRACER WIRE TO ABOVE GROUND BOTH ENDS. 8. THERE SHALL BE NO FUTURE TEE CONNECTIN ON PIPING WITHOUT IT ON YOUR APPROVED PLAN. 9. THIS INSTALL SHALL REQUIRE INSTALL OF 2ND STAGE REGULATOR PER PLAN. |