Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - INTERMEDIATE
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/18/2006 | PLUMBING - INTERMEDIATE | Approved | IVRS - Inspection :* | |
| 05/16/2006 | PLUMBING - INTERMEDIATE | Partial Approval | IVRS - Inspection :* - DWV W/TEST THRU ROOF IS OK - GAS PIPING NOT INSTALLED PER PLAN BUT DOES NOT MEET CODE REQUIREMENTS. 30 PSI TEST. - INSTALL PER PLAN OR REVISE. - AT GAS PRESSURE TEST FINAL - USE A 15 PSI GAUGE WITH 1/10 PSI INCREMENTATION. - WATER PIPING PLANS CALL FOR ICE MAKER LINE TO BE SUPPLIED FROM UNDER KIT. SINK. - PROVIDE 18" OF COPPER AT WH BEFORE TRANSITIONING TO PEX. (SWEAT VALVES AND PLEXES ARE SUBJECT TO FUTURE REPLACEMENT). |