Inspection History Details
Inspection Status: Approved
Inspection History: BUILDING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/04/2007 | BUILDING - FINAL | Approved | IVRS - Inspection :* | |
| 12/18/2006 | BUILDING - FINAL | Partial Approval | IVRS - Inspection :* 1) WILL NEED ELECTRIC ON FOR FINAL |
|
| 12/13/2006 | BUILDING - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) CONNECT TO GAS PACK 2) INSTALL SEDIMENT TRAPS 3) LABEL ALL BREAKERS IN PANEL 4) NON METALIC PLUMBING LABEL IN PANEL 5) DBL LUGGED NEUTRALS NOT PERMITTED 6) VACUUM BREAKERS REQUIRED ON HOSE BIBS 7) INSTALL VENT FOR DRYER 8) SUB PANEL WIRED INCORRECTLY: NEUTRAL SPLICED TO HOT, HOTS DBL LUGGED, MACHINE SCREWS NEEDED FOR COVER AND CLEANOUT DEBRIS 9) CONNECT RANGE |